• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    北

    北京纽曼帝莱蒙膜建筑技术有限公司

    企业EST. 1995
    23论文总数
    176引用总数

    生产膜结构产品、膜工业制品(限分支机构经营);自产产品的设计、安装、维修、技术咨询;销售自产产品;钢结构工程制作与安装。(依法须经批准的项目,经相关部门批准后依批准的内容开展经营活动。)

    论文量&引用量时间轴

    机构学者

    排序
    Yang LIAO
    Yang LIAO
    论文:7引用:0H-index:0
    Wensheng Wang
    Wensheng Wang
    Meixin Raymond (Beijing) membrane construction technology Co., Ltd
    论文:5引用:0H-index:0
    Jiaqi Ge
    Jiaqi Ge
    China Aviat Planning & Design Inst Grp Co Ltd
    论文:4引用:0H-index:0
    Qiang Guo
    Qiang Guo
    论文:3引用:0H-index:0
    Guojun Zhang
    Guojun Zhang
    China Aviation Planning and Design Institute (Group) Co., Ltd.
    论文:3引用:0H-index:0
    ShaoXian Guo
    ShaoXian Guo
    论文:3引用:0H-index:0
    Lai Xiaoyan
    Lai Xiaoyan
    论文:3引用:0H-index:0
    chensheng liu
    chensheng liu
    论文:3引用:0H-index:0
    Xiaobing Ye
    Xiaobing Ye
    论文:3引用:0H-index:0

    论文(23)

    年份
    起
    –
    止
    排序
    1Design and research on cable dome structural system of the National Fitness Center in Ejin Horo Banner,Inner Mongolia
    ZHANG Guojun,GE Jiaqi,WANG Shu,ZHANG Ailin,WANG Wensheng,WANG Mingzhu,XU Keran

    The structural system of cable dome with span of 71.2 m is employed for the roof structure of the National Fitness Center in Ejin Horo Banner,Inner Mongolia.It's the first large-span cable dome structure in mainland of our country.Firstly,the whole finite element model of cable dome structure was established and subjected to static analysis under various design and normal load combinations.That the unevenly distributed load was detrimental for cable dome structure was put forward by analyzing the force-bearing characteristics of cable dome structure at elastic stage.Secondly,the conclusions were drawn that the torsional stiffness of cable dome was weak and the membrane can improve the torsional stiffness effectively by analyzing dynamic characteristics.Subsequently,the whole process of elasto-plastic bucking analysis for cable dome system was performed to obtain the three stages in the whole loading process:relaxation of ridge cable,yielding of loop cable and breaking of structure.Meanwhile the influence of geometrical parameters on structural elasto-plastic performance was analyzed.Finally,the design method of cable dome structure based on performance was proposed,the strength and deformation performance and bearing capacity control indexes at each stage were put forward.

    2012Journal of Building Structures(2012)引用:41
    引用
    AI阅读
    加入学术空间
    2Analysis of Tension Form-Finding and Whole Loading Process Simulation of Cable Dome Structure
    葛家琪,张爱林,刘鑫刚, 张国军,叶小兵, 王树,刘学春

    For cable dome structure,prestressing construction process is the change of the geometrical system from mechanism to structure which can bear design load.The following aspects are considered including the prestressed cable system setting and achieving of the formed shape of structure by prestress tension,the formed shape of structure satisfying normal use and safety requirements,determining the reasonable form by optimization of prestressing degree.Prestress tension form-finding and simulation of whole loading process were analyzed through restart analysis for cable dome structure.Firstly,as prestress tension methods has no influence on the final formed shape of structure by analyzing prestress tension simulation for cable dome structure,a flexible technical space will be created for construction unit formulating plans of prestress tension.Secondly,the whole process simulation under different prestressing degrees was performed to obtain performance control indexes at each stage.The prestress rationality and safety of structure were determined based on the conclusions for the project.At last,the initial prestressing degree P0 that can keep the initial geometric form was determined.The research shows that the initial prestress P0 of 7.5~10.0 times as the design prestress is the safe and reasonable choice by analyzing the elasto-plastic ductile performance of different span cable dome structures under different prestressing degrees.The research methods and conclusions was used in design of large-span cable dome structure,which is roof structure of the National Fitness Center in Ejin Horo Banner,Inner Mongolia,first built in mainland of our country.

    2012Journal of Building Structures(2012)引用:23
    引用
    AI阅读
    加入学术空间
    3Experimental study on forming process of cable dome structure
    GE Jiaqi,XU Ruilong,LI Guoli,WANG Wensheng,ZHOU Wensheng,YOU Deqing,ZHANG Guojun,WANG Zeqiang

    The cable dome can be tensioned by applying prestressing force on all or parts of cables,other nonprestressed cables are tensioned fassively in the same time.According to numerical calculating methods of different prestressing the whole structure,it is confirmed that different loading procedures have nothing to do with final stress and displacement behavior.The 1∶ 4 structural model for roof structure of the National Fitness Centre in Ejin Horo Banner,Inner Mongolia was built through ground consolidating,upgrading step-by-step,synchronous tensioning method,and numerical calculating by ANSYS in order to verify the proposed method.By reasonably arranging force-sensors for monitoring,the whole inner force changing procedure of cables from assembling to formation.The experimental results were obtained and showed perfect match with calculated results.The change point from mechanism to structure can be found to be the point when the ridge cable started to be tensioned through the force curve of the model test.The key point of cables turning into dome is the starting of ridge cable forced to load prestress.

    2012Journal of Building Structures(2012)引用:5
    引用
    AI阅读
    加入学术空间
    4Dynamic simulation of cable dome construction
    叶小兵,葛家琪,程书华,王文胜,张国军,胡庆卫

    The structural system of cable dome is adopted in the building roof of the National Fitness Center in Ejin Horo Banner,Inner Mongolia.The accurate simulation of the cable dome roof construction is very difficult.In accordance with the construction plan,the method of mechanical multibody system dynamics analysis is used to conduct the complete dynamic simulation of the whole construction process of the cable dome roof.To carry out the dynamic simulation,the time dependent changes are monitored in terms of the position,velocity,orientation and internal force of every structural member.The tendency of the transformation in system shape and prestressing force distribution is shown.The risks of sudden changes in some mechanical properties or appearance of deadlocked mechanism are also checked.The comparative analysis of the dynamic simulation results and the on-site measurements show the correctness of the proposed method.

    2012Jianzhu Jiegou Xuebao/Journal of Building Structures(2012)引用:3
    引用
    AI阅读
    加入学术空间
    5Procedure of Tensioning the Cable-membrane System of the Toll Station on the South Line Towards Beijing Airport
    胡庆卫,叶小兵
    2011引用:23
    引用
    AI阅读
    加入学术空间
    立即登录,查看全部 23 篇论文

    合作机构(9)

    中国航空规划设计研究总院有限公司合作论文 4
    河北省第四建筑工程有限公司合作论文 3
    浙江精工钢结构集团有限公司合作论文 2
    北京工业大学合作论文 2
    浙江省一建建设集团有限公司合作论文 2
    北京市建筑设计研究院有限公司合作论文 1
    北京市建筑工程研究院有限责任公司合作论文 1
    北京交通大学合作论文 1
    北京市水利规划设计研究院合作论文 1

    机构统计