
This paper presents an original Make-to-Availability (MTA) model for repetitive production, identifying conditions where it outperforms the classical Make-to-Stock (MTS) model. While the MTA concept originated from the Theory of Constraints, it lacked detailed operational definitions. The authors define these parameters and conduct a comparative study using computer simulations based on a real industrial automation enterprise to ensure high-fidelity test parameters. The primary objective is to find an optimal trade-off between conflicting metrics: minimising operational costs and maximising product availability. Unlike cyclical MTS, the dynamic MTA model continuously monitors inventory across three buffer zones. Production triggers and prioritisation depend on buffer penetration, synchronising output with demand while actively managing capacity. The study employs a multi-criteria objective function to evaluate these models under varying demand and capacity loading. Although based on a single case study - a recognised method for testing innovative models - the findings offer analytical generalisations for high-volume consumer goods manufacturing. To enhance credibility, a bootstrap analysis was incorporated for statistical verification, demonstrating result stability. Findings show MTA's superiority under high demand volatility and capacity constraints, where it significantly improves customer service levels while avoiding excessive inventory costs and capital engagement.
Manufacturing companies increasingly require scheduling approaches that integrate practical constraints such as workforce availability, maintenance, setup dependencies, energy objectives, and uncertainty, yet existing research offers limited support for transferring them into heterogeneous industrial data landscapes. This paper proposes a scalable and modular architecture for integrated and dynamic scheduling that combines an Asset Administration Shell-based middleware for standardised data integration, a heterogeneous graph representation of scheduling instances, a graph neural network-based State Modeler, and a Proximal Policy Optimisation-based RL-Scheduler coupled with event-based simulation. The architecture is validated on the production system of a German machinery manufacturer with 59 manufacturing resources and 39 employees and on public benchmark instances. On the industrial instances, the learned policy reduces the makespan against the mean of seven dispatching baselines by 2.93% to 6.76% across six evaluation cells covering small-part, large-part, and combined production under deterministic and stochastic machine failures, with statistical significance in every scenario. The energy-aware configuration preserves this makespan performance while significantly reducing the relative energy cost in most scenarios. The findings indicate that the proposed architecture provides a practically transferable pathway for configurable RL-based scheduling in heterogeneous production environments.
This study examines how consumers' perceptions of manufacturing sustainability signals are associated with behavioural responses in the fast-moving consumer goods (FMCG) sector. Drawing on Signalling Theory and selected behavioural logic from the Theory of Planned Behaviour, it compares perceived low-carbon factory practices, circular packaging features, and environmental certification credibility. Survey data from 338 Indian consumers were analysed using Partial Least Squares Structural Equation Modelling (PLS-SEM). All three signals were positively associated with green trust and perceived green value. Low-carbon factory practices and certification credibility were negatively associated with perceived greenwashing risk, whereas circular packaging showed no significant association. Green trust and perceived green value were positively associated with purchase intention, while perceived greenwashing risk was negatively associated with it. Purchase intention was positively associated with willingness to pay a premium. Environmental concern strengthened the perceived green value-purchase intention relationship, whereas perceived regulatory support strengthened the certification credibility-green trust relationship. Because the study examines consumer perceptions rather than objectively verified factory performance, the findings explain how manufacturing sustainability investments are interpreted in the marketplace. The study further proposes a consumer-informed Signal Investment Prioritisation Matrix that integrates estimated total effects and boundary conditions into a practical decision-support framework for sequencing manufacturing sustainability investments.
As global electricity demand surges due to industrial electrification and digitalisation, peak power (PP) management has emerged as a critical challenge in energy-intensive manufacturing, affecting operational costs and grid capacity. PP is defined as the maximum instantaneous total power demand across all workstations during the production cycle, and its minimisation is essential for reducing demand charges and avoiding grid overloads. This study introduces the balancing and scheduling of machining transfer lines as a bi-objective optimisation problem that simultaneously minimises cycle time (CT) and PP under precedence, inclusion/exclusion, and technological compatibility constraints. A multi-objective constraint programming (CP) model is formulated and solved via a bidirectional epsilon-constraint method, generating high-quality Pareto sets for small-scale instances. To overcome the computational intractability of CP for medium- and large-scale problems, a multi-objective variable neighbourhood search (MOVNS) enhanced with deep reinforcement learning (NN_MOVNS) is proposed, in which a Deep Q-Network adaptively guides neighbourhood operator selection throughout the search. Computational experiments on 55 benchmark instances demonstrate that NN_MOVNS consistently outperforms competing algorithms across all problem scales, with improvements becoming increasingly pronounced on larger instances, as confirmed by statistical significance tests. Peak shaving experiments confirm PP reductions ranging from 33% to 73% with modest CT increases averaging 5.7%. An industrial-scale test instance of a 148-task automotive cylinder head production line achieves an 11.8% CT reduction and a 63.1% PP reduction, lowering the peak-to-average power ratio from 2.35 to 1.49.