• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    Sustainable Energy Grids & Networks

    Sustainable Energy Grids & Networks

    JournalISSN 2352-4677eISSN 2352-4677中科院 工程技术 2区

    年发文量

    研究主题

    论文(2268)

    排序
    1Demand-urgency-driven Coordinated Charging: Minimizing Carbon Emissions and Grid Load Variance in Diverse Electric Vehicle Charging Modes
    Liting Liang, Jing Zhang, Yuanzhi Jin
    2026
    引用
    AI阅读
    加入学术空间
    2The Cost of Decoupled Planning: Co-optimising Transmission, Batteries and Hydrogen under Demand-Side Participation in a European Power System
    Erik F. Alvarez,Luis Olmos,Andrés Ramos

    High shares of renewable energy sources require transmission expansion planning (TEP) to account for flexibility resources that substitute for lines. This paper quantifies the cost of planning those resources separately from the network. National and cross-border transmission, battery energy storage systems (BESS) and hydrogen (H2) subsystems are co-optimised across 15 pathways and 12 scenarios on an 84-node European network, with demand-side management (DSM) at three participation levels and a fixed generation fleet. Storage and transmission substitute for one another in 45 of 48 paired comparisons, and in every one where national lines can be built: BESS reduce annualised network investment by a median of 3.5–7.8% and grid capacity needs by up to 12.4%, and hydrogen by at most 1.3%. The transmission scope reverses the curtailment effect of hydrogen: the H2 turbine reduces curtailment in all 24 comparisons restricted to cross-border lines and increases it in 22 of 24 comparisons that admit national lines. Physical and economic criteria rank storage technologies in opposite orders. Pathways without BESS require 5.4 times more grid capacity per unit of storage, whereas hydrogen returns 62–73% against 13–17% for BESS, excluding avoided scarcity costs; on the same basis, cross-border lines return 31% and national lines 56%. Planning storage and transmission separately costs 0.18–1.67% of annual system cost. DSM improves adequacy and defers capital without lowering operating cost: investment falls by 5.8–10.7% while the cost of building and operating the system rises by 1.2–4.6%. National reinforcement, not cross-border lines, serves all demand; without it, 5–24 TWh/year are unserved.

    2026
    引用
    AI阅读
    加入学术空间
    3A Two-Stage Physics-Aware Framework for Distinguishing False Data Injection Attacks from Sudden Load Changes in PMU-assisted State Estimation
    Vladimir Bečejac,Ark Dev,Tummala S.L.V. Ayyarao,Shubhrajyoti Kundu
    2026
    引用
    AI阅读
    加入学术空间
    4Distributionally Robust Unit Commitment with Inertia Heterogeneity Partitioning for Frequency-Secure Operation of High Renewable Penetration Power Systems
    Zhenghui Zhao, Jinhui Sun, Buyang Qi, Shaowei Liang, Qian Zhang
    2026
    引用
    AI阅读
    加入学术空间
    5Adaptive, Degradation-Aware, and Safety-Constrained Power Allocation for State-of-charge Balancing in Networked Battery Energy Storage Systems
    Md.Ebrahim Khallil, Abdullah Al Mamun, Md.Nur-A-Adam Dony,Md.Galib Hasan, Md.Jakir Hossen

    Networked battery energy storage systems (BESSs) require accurate state-of-charge (SoC) balancing under cell aging and explicit safety enforcement at the power-sharing layer. This paper proposes an adaptive, degradation-aware, and safety-constrained power-allocation framework for networked BESSs, built on three integrated layers: (i) a nonlinear adaptive observer that estimates SoC, ohmic resistance R0, and usable capacity from local measurements, aided by a zero-sum probing signal whose amplitude follows a closed-form design rule linking measurement noise to a target identification accuracy; (ii) a degradation-aware allocation law that shifts power burden away from high-resistance cells through a tunable resistance penalty; and (iii) a safety layer that computes the exact Euclidean projection of the raw commands onto the feasible set defined by SoC, voltage, current, and cell-power limits, tracking the aggregate demand when feasible and derating it otherwise. Uniform ultimate boundedness of the observer error is established with an explicit Lyapunov matrix, and the estimation–safety cascade is shown to preserve aggregate feasibility, with respect to the limits evaluated on the estimated states, to machine precision independently of estimation quality. Simulations on 4-unit and 16-unit networked BESSs show that the scheme reduces the R0 estimation error from 15.2% to 2.0%, lowers the high-R0 loss fraction by up to 8.3% under non-uniform aging, and achieves 5.6% lower total ohmic loss than a consensus-based SoC balancer. Multi-seed robustness studies confirm graceful degradation under measurement noise, observer-side parameter mismatch, and communication delays and packet loss.

    2026
    引用
    AI阅读
    加入学术空间
    立即登录,查看全部 2268 篇论文

    高被引作者

    作者引用发文
    Phuong H. Nguyen9709
    Madeleine Gibescu7837
    W. L. Kling7633
    E. Mocanu (Elena)6181
    Sasan Pirouzi3845
    João P. S. Catalão33912
    Yuzhu Duan3341
    Jiangping Hu3341
    赵奕奕3341
    Jiashen Teh3155

    高产作者

    作者引用发文
    Mattia Marinelli23814
    João P. S. Catalão33912
    Dirk Van Hertem9212
    Marco Merlo30612
    Pierluigi Siano17711
    Luigi Vanfretti19511
    Kazem Zare8710
    Zita Vale15010
    Georgios C. Kryonidis3710
    Gianfranco Chicco799

    相关期刊

    IEEE Transactions on Smart Grid
    IEEE Transactions on Sustainable Energy
    IEEE Transactions on Power Systems
    Journal of Modern Power Systems and Clean Energy
    IET Generation, Transmission and Distribution
    Electric Power Systems Research
    Iet Renewable Power Generation
    CSEE Journal of Power and Energy Systems
    IEEE OPEN ACCESS JOURNAL of POWER and ENERGY
    IET SMART GRID