DETAILED DESIGN, MANUFACTURING AND TESTING OF A STRIP- LINE EXTRACTION KICKER FOR CTF3 COMBINER RING

msra

引用 23|浏览5
暂无评分
摘要
The first calculations to design the CTF3 Combiner Ring extraction kicker are reported elsewhere. The last computing step before fabrication is the wakefield analysis, to determine if the bunch disturbance is acceptable. Two different codes have been used for cross- checking: CST Particle Studio and GDFidl. The computation is challenging because of the long structure (2.4 m) with a short bunch (3 mm). Besides, both transitions are not equal, as a result of different straight sections of the input and output beam pipe, and then the solution method is more complex. On the other hand, the main challenges for manufacturing are the long electrodes support by ceramic stand-offs and the flexible electrical connections to allow for electrodes thermal differential displacement. Special tooling has also been developed for assembly within the required tolerances. The device has been successfully leak tested. High frequency transmission coefficients and dielectric strength were also measured.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要