Operation status of secral at IMP

IPAC 2011 - 2nd International Particle Accelerator Conference(2011)

引用 2|浏览26
暂无评分
摘要
SECRAL (Superconducting ECR ion source with Advanced design in Lanzhou) is an advanced superconducting ECR ion source built with an innovative solenoid-inside-sextupole structure in 2005. Since 2007, SECRAL has delivered a good variety of highly-charged ion beams to HIRFL (Heavy Ion Research Facility in Lanzhou), such as 129Xe27+,78Kr 19+,209Bi36+ and 58,64Ni 19+ etc., and its beam delivery time increased greatly year by year. So far up to July 2011, the beam delivery by SECRAL has totalled up to almost 8000 hours. To meet the increasing demands, further improvements are planned and undertaking to enhance the capability of SECRAL. Detail results and discussions are presented in this paper.. Copyright © 2011 by IPAC'11/EPS-AG.
更多
查看译文
关键词
null
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要