An Evolutionary Implicit Enumeration Procedure For Solving The Resource-Constrained Project Scheduling Problem

INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH(2017)

引用 22|浏览7
暂无评分
摘要
This paper presents a procedure for solving the resource-constrained project scheduling problem. It consists of an implicit enumeration module and a genetic algorithm. If the procedure is provided access to all of its required computational resources of the problem at hand, it guarantees the optimality of the produced solution. In contrast, and in the case of limited access to computational resources, the procedure gradually moves the root of the search-tree downward, and consequently prunes part of the search space, trading speed with precision effectively. In the cases where speed has been traded with precision, and the guarantee of optimality has been lost, the final schedule created by the implicit enumeration module is used as a template whose modified instances fill an initial pool of a genetic algorithm to improve the proposed solution. The procedure has been applied to 2040 benchmark instances. The results are promising; whereas for all small- and some medium-sized instances, the procedure has found and guaranteed optimal solutions, for other instances, whose optimal solutions cannot be guaranteed within the limit of computational resources, it has produced high-quality solutions.
更多
查看译文
关键词
search-tree, genetic algorithm, implicit enumeration, combinatorial optimization, scheduling, project management
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要