PHM based predictive maintenance optimization for offshore wind farms
2015 IEEE Conference on Prognostics and Health Management (PHM)(2015)
摘要
In this paper, a simulation-based real options analysis (ROA) approach is applied to valuate the predictive maintenance options created by PHM for multiple turbines in offshore wind farms managed under outcome-based contracts known as power purchase agreements (PPAs). When a remaining useful life (RUL) is predicted for a subsystem in a single turbine, a predictive maintenance option is triggered. If predictive maintenance is implemented before the subsystem or turbine fails, the option is exercised; if the predictive maintenance is not implemented and the subsystem or turbine runs to failure, the option expires and the option value is zero. The time-history cost avoidance and cumulative revenue paths are simulated considering the uncertainties in wind and the RUL predictions. By valuating a series of European real options based on all possible predictive maintenance opportunities, the maintenance opportunity with the maximum value can be obtained. In a wind farm, there may be multiple turbines concurrently indicating RULs. To model multiple turbines managed via an outcome-based contract (PPA), the cumulative revenue and cost avoidance for each turbine depends on the operational state of the other turbines in the farm, the amount of energy that has been delivered and will be delivered by the whole farm. A case study is presented that determines the optimum predictive maintenance opportunity for a farm under a PPA, the optimum predictive maintenance opportunity for the same farm managed via an as-delivered contract, and the optimum predictive maintenance opportunities for individual turbines managed independently.
更多查看译文
关键词
offshore wind farms,Prognostics and Health Management,real options analysis,power purchase agreement,predictive maintenance,maintenance optimization,outcome-based contract
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络