谷歌浏览器插件
订阅小程序
在清言上使用

A Role Mengxi UHVDC Project Plays in Improving the Energy Demand in the Central China Power Grid

Xu Zheng, Jiang Hong Wang,Shuang Zhao,Mei Li,Bu Han Zhang,Ni Zeng,Ruo Xi Zhu, Yuan Fang Zeng

Advanced materials research(2014)

引用 0|浏览1
暂无评分
摘要
A province in the central China faces the problem of energy shortage, 800kV Mengxi UHVDC project will effectively broaden the energy input channels of the province, enhance energy supply security, and reduce the pressure on coal transportation. This paper analyses the load, power supply and power shortage of a central province, and explored the role of Mengxi UHVDC project played in improving the energy demand in the Central China power grid. By comparing the different access plans to the grid, this paper demonstrated that it’s more appropriate to divide the Mengxi UHVDC into 1000kV and 500kV at the inverter side for consuming the power of UHVDC and protecting the normal power supply.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要