谷歌浏览器插件
订阅小程序
在清言上使用

Cyclic Scheduling of Parts and Robot Moves in M-Machine Robotic Cells

Computers & operations research(2018)

引用 27|浏览11
暂无评分
摘要
We consider a flow shop type manufacturing cell consisting of m machines and a material handling robot producing multiple parts. The robot transfers the parts between the machines and loads/unloads the machines. We consider the cyclic scheduling of the parts and the robot moves with the objective of maximizing the throughput rate. We develop a mixed integer linear programming formulation of the problem. The formulation is improved with several valid inequalities and reformulations of the constraints. We also develop a hybrid metaheuristic algorithm for this strongly NP-Hard problem. The algorithm is modified to handle both 1-unit and multi-unit robot cycles. Multi-threading is used to parallelize the algorithm in order to improve its efficiency. After calibrating the parameters of the heuristic algorithm, an extensive computational study is performed to evaluate its performance. The results of this study revealed that the developed heuristic provides near-optimal solutions in reasonable solution times. The effects of parallelization and the benefits of considering multi-unit cycles instead of 1-unit cycles are also quantified. Our computational tests show that multi-unit cycles improve the throughput rate by 9% on the average. The improvement can reach to 20% depending on the problem parameters. (C) 2017 Elsevier Ltd. All rights reserved.
更多
查看译文
关键词
Robotic cell scheduling,Multiple parts,Mixed integer linear programming formulation,Hybrid metaheuristic,Throughput maximization
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要