A Reliable Scheduling Algorithm For Render Cluster System
2017 15TH IEEE INTERNATIONAL SYMPOSIUM ON PARALLEL AND DISTRIBUTED PROCESSING WITH APPLICATIONS AND 2017 16TH IEEE INTERNATIONAL CONFERENCE ON UBIQUITOUS COMPUTING AND COMMUNICATIONS (ISPA/IUCC 2017)(2017)
摘要
According to the problem in a rendering management system of time consumption in task scheduling and abnormalities in the procedure of rendering, the classical solution applies on the strategy of one-time scheduling. The strategy would increase the quantity of the frames which are not rendering successfully because of the accumulation of the frames which are not rendering, especially at the condition with a large number of frames in a scene. The anomaly probability of a render unit will be increased with the increasing quantity of slave nodes in a render unit. In this thesis, a new reliable task scheduling algorithm is proposed based on several dynamic scheduling for the purpose of decreasing render failure rate. The experiments are conducted to evaluate the performance of the proposed algorithms and compared with the one-time scheduling algorithm, the results that the proposed algorithm has a better performance in render failure rate and resource utilization.
更多查看译文
关键词
Rendering, Scheduling, Reliability, Resource Utilization
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络