Two-objective stochastic flow-shop scheduling with deteriorating and learning effect in Industry 4.0-based manufacturing system.

Applied Soft Computing(2018)

引用 144|浏览20
暂无评分
摘要
•Propose a novel flow-shop scheduling model with consideration of multiple objectives, uncertainty, deteriorating and learning effect.•Develop a novel multiobjective discrete fireworks optimization algorithm to solve the model above.•Validate the performance of the proposed model and algorithm.
更多
查看译文
关键词
Industry 4.0,Flow-shop scheduling,Multi-objective optimization,Uncertainty,Time-dependent processing time
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要