Stabilization of the Arrival Time of a Relativistic Electron Beam to the 50 Fs Level
Physical review Accelerators and beams(2018)
摘要
We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The system latency was 350 ns and the correction bandwidth > 23 MHz. The system meets the requirements for CLIC.
更多查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要