An effective metaheuristic algorithm for flowshop scheduling with deteriorating jobs

Journal of Intelligent Manufacturing(2018)

引用 23|浏览42
暂无评分
摘要
The deterioration effect in flowshop scheduling has gained a growing concern from the community of operational research in recent years. However, all of existing studies focus on two- or three-machine flow shops. In this paper, a m -machine (m>3) flowshop scheduling problem (FSSP) with deteriorating jobs is investigated and a novel metaheuristic algorithm called multi-verse optimizer (MVO) is employed to solve it. The MVO algorithm can accomplish the optimization process via exchanging objects of universes through white/black hole and wormhole tunnels. In the novel MVO algorithm, a new elitist selection scheme is designed to construct the effective white/black hole tunnels, whereas two different local search operators are hybridized and embedded to further enhance the exploitation capability. Experimental results indicate that the proposed algorithm can achieve the satisfactory performance in solving the investigated FSSP with deteriorating jobs.
更多
查看译文
关键词
Scheduling, Flowshop scheduling, Deterioration, Metaheuristic algorithm, Multi-verse optimizer
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要