Repository Planning, Design, and Engineering: Part II—Equipment and Costing

BIOPRESERVATION AND BIOBANKING(2016)

引用 1|浏览14
暂无评分
摘要
Part II of this article discusses and provides guidance on the equipment and systems necessary to operate a repository. The various types of storage equipment and monitoring and support systems are presented in detail. While the material focuses on the large repository, the requirements for a small-scale startup are also presented. Cost estimates and a cost model for establishing a repository are presented. The cost model presents an expected range of acquisition costs for the large capital items in developing a repository. A range of 5,000-7,000 ft(2) constructed has been assumed, with 50 frozen storage units, to reflect a successful operation with growth potential. No design or engineering costs, permit or regulatory costs, or smaller items such as the computers, software, furniture, phones, and barcode readers required for operations have been included.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要