Ecrh At W7-X - Concurrent Operation Of 10 Gyrotrons

2018 43RD INTERNATIONAL CONFERENCE ON INFRARED, MILLIMETER, AND TERAHERTZ WAVES (IRMMW-THZ)(2018)

引用 2|浏览53
暂无评分
摘要
At the stellarator Wendelstein 7-X (W7-X) Electron Cyclotron Resonance Heating (ECRH) is the main heating system for steady-state operation and was the only available heating system during the operation phase OP1.2a in 2017. The ECRH, equipped with 10 operational 140 GHz gyrotrons [1], was used for different tasks at W7-X such as wall conditioning, controlled plasma start-up from the neutral gas up to steady state plasma control and different heating scenarios such as X2-mode and O2-mode heating as well as current drive (ECCD). The achieved plasma parameters with respect to the performance of the ECRH plant will be discussed.
更多
查看译文
关键词
electron cyclotron resonance heating,neutral gas,ECRH plant,plasma parameters,O2-mode heating,steady state plasma control,controlled plasma start-up,wall conditioning,operation phase OP1.2a,steady-state operation,main heating system,stellarator Wendelstein 7-X,10 gyrotrons,concurrent operation,frequency 140.0 GHz
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要