A Simulation Approach Based Project Schedule Assessment
SIMULTECH: PROCEEDINGS OF THE 9TH INTERNATIONAL CONFERENCE ON SIMULATION AND MODELING METHODOLOGIES, TECHNOLOGIES AND APPLICATIONS, 2019(2019)
Abstract
Traditional program evaluation and review technique lacks of complex task relation models. To tackle this, this paper proposes a project schedule risk assessment model based on extended Petri net, in which the characteristics of task duration, task overlap and sub-tasks are modelled. Based on the characteristics of concurrent iteration in product development schedule, the influence of each sub-task relationship on the simulation uncertainty is considered. In this case, several mathematical distributions are used to simulate the schedule of the subtask based on its own characteristics and the relationship between them. Based on the above modelling, the key path of the project schedule is selected, and the transition mechanism of state change in the simulation is designed. Finally, simulation results show that the proposed project schedule risk assessment method can provide specific reference for the development plan of the whole project and its sub-projects. In addition, the model can also be used to evaluate the cost of the project and establish the cost standard of the project according to the evaluation.
MoreTranslated text
Key words
Project Schedule, Simulation, Petri Net
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined