谷歌浏览器插件
订阅小程序
在清言上使用

A Comparison of Three Simulation Methodologies for a Lean Six Sigma Manufacturing Project – a Business Case Study

International journal of lean six sigma(2019)

引用 5|浏览9
暂无评分
摘要
Purpose This paper aims to compare the prognostic and visualisation capabilities of all the three simulation paradigms to identify their suitability and rigor in eliminating weaknesses and bottlenecks in a Lean Six Sigma (LSS) project. Design/methodology/approach The paper uses an light-emitting diode (LED) factory as a business case to show the differences and advantages of using three different simulation techniques to solve a manufacturing problem. Findings Even though this is only one business case that shows how system dynamics (SD) can be effective in a Six Sigma manufacturing project, more examples are needed to validate this hypothesis within Six Sigma and Lean manufacturing fields. Even though, discrete-events (DE) and agent-based (AB) models are both equally well suited to develop the manufacturing processes and the choice of what to use may be arbitrarily dependent on the available software or the preference of the modeller, hybrid models seem to become extremely powerful. Therefore, more hybrid models need to be constructed within LSS (especially when a flowchart and a SIPOC ((Suppliers, Inputs, Process, Outputs and Customers) table are combined to develop a hybrid model) to achieve the most accurate results with accurate representation of reality. Originality/value There are three commonly used simulation techniques, DE, AB and SD, but choosing the right simulation methodology has often been a challenge.
更多
查看译文
关键词
System dynamics,Simulations,Agent-based,Discrete-events,Lean six-sigma
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要