Vacuum System Design, Construction, And Operation For The Cornell High Energy Synchrotron Source Upgrade

Yevgeniy Lushtak, David Burke,Yulin Li,Aaron Lyndaker,Xianghong Liu, Laurel Ying

VACUUM(2021)

引用 4|浏览4
暂无评分
摘要
During the summer and fall 2018, the Cornell High Energy Synchrotron Source (CHESS), underwent an upgrade that recast the facility as primarily a low emittance X-ray source. The upgrade replaced one sixth of the Cornell Electron Storage Ring (CESR) with six double-bend achromats, featuring four novel CHESS Compact Undulator (CCU) insertion devices, and switched CESR to single particle beam operation. At the time of this writing, the upgraded storage ring has achieved the CHESS-U design goal of operating with 200 mA of positron current at 6.0 GeV beam energy. Seven out of eleven CHESS-U beamlines are currently in X-ray user operation. The construction and the commissioning of the new section of the CESR accelerator required novel solutions to design, fabrication, and vacuum system operations. Significant design considerations and efforts were made to minimize X-ray 'dark-time', returning to operation less than 1 year. This paper describes the important milestones of the process, the solutions implemented, and the present status of CHESS-U.
更多
查看译文
关键词
UHV, Particle accelerators, Synchrotron light sources, Vacuum simulation, Photon-induced desorption
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要