Feasibility Study On The In-Service Testing Program Plan For Safety-Related Dampers Of Advanced Power Reactor-1400

Shincheul Kang,Chan Park, Kyungho Lee, Sungho Lee

JOURNAL OF NUCLEAR ENGINEERING AND RADIATION SCIENCE(2021)

引用 0|浏览0
暂无评分
摘要
In-service testing (IST) program including test and examination has been emphasized to assess the operability of the safety-related components in nuclear power plants. Since the issuance of ASME N511 in 2007 concerning IST for air treatment, heating, ventilating, and air conditioning (HVAC) systems, the IST program plan for those systems should be needed to establish prior to setting up the detailed program. The proper plan can contribute to enhance the effectiveness of allotment of the resources inevitable for implementation of the program and ultimately save operation and maintenance costs. In order to achieve the purposes, this paper presents the methodologies to establish IST program plan for safety-related dampers including their selection process of the dampers to be included in the program and representative template made by applying the methodologies. In addition, the method to identify testing types per damper for part of selected dampers is also provided in this paper.
更多
查看译文
关键词
air treatment, heating, ventilating, and air conditioning (HVAC), damper, in-service testing (IST), IST program plan, safety-related
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要