Cement suppliers of shimizu-gumi construction sites during the interwar period

Keiichi MIYATANI,Naoyuki MATSUMOTO, Ryohei KUMAGAI,Tomoyuki GONDO,Shuichi MATSUMURA

Journal of Architecture and Planning (Transactions of AIJ)(2021)

引用 0|浏览1
暂无评分
摘要
The purpose of this paper is to clarify the cement suppliers for each construction site during the interwar period when cement consumption increased in Japan. Specifically, the authors picked up and analyzed the cement suppliers at each construction site from the contents of the "Completion Reports", which are the construction records made by Shimizu-gumi during this period. There are 3,186 completion reports in total, of which 1,729 have a description of the cement supplier. These 1,792 cases are summarized in tables and figures by use, structure type, prefectures, year of construction, and total floor space. (See Table1-Table3, Fig.2-Fig.3)
更多
查看译文
关键词
cement suppliers,construction,shimizu-gumi
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要