Integrated Multi-Stage Coordination Planning of Transmission Network and Thermal Generation Units’ Flexibility Reformation

2020 IEEE 4th Conference on Energy Internet and Energy System Integration (EI2)(2020)

引用 0|浏览0
暂无评分
摘要
In order to address the wind energy accommodation problem caused by the increasing wind energy generation, the integrated multi-stage coordination planning of transmission network and thermal generation units’ flexibility reformation is proposed. With the combination of the optimization of transmission network planning and thermal generation units’ flexibility reformation schemes, the flexibility resources of power sources and power grids are utilized to improve large-scale wind energy consumption. The time value of funds is considered into the formulated integrated multi-stage coordinated planning model to improve the accuracy of flexibility transformation of thermal generation units and grid development investment. The example analysis shows that the proposed method can guarantee the expected wind energy consumption, and reduce the operation cost and investment cost of power system.
更多
查看译文
关键词
Integrated multi-stage coordination planning,transmission planning,thermal generation units’ flexibility reformation,power system
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要