On the Impact of Transport Times in Flexible Job Shop Scheduling Problems.

IEEE International Conference on Emerging Technologies and Factory Automation (ETFA)(2022)

引用 0|浏览13
暂无评分
摘要
Manufacturing systems require a careful scheduling of the resource usage to maximize the production efficiency. In a completely automated environment, the transport system should be orchestrated to work smoothly with the other resources. While the impact of job characteristics, such as fixed or variable processing times of the tasks composing the jobs, or task dependencies, has been extensively studied, the role of the transport system has received less attention. In this paper we consider a conveyor belt as a mean of transportation among a set of production machines. In this scenario, there is no input or output buffer at the machines, and the transport times depend on the availability of the machines. We propose a heuristic based on randomization, called SCHE-DT, which is able to find a near optimal joint schedule for job processing and transfer in few seconds. We test our solution on known benchmarks, along with real-world instances, showing that our scheduler is able to predict accurately the overall processing time of a production line.
更多
查看译文
关键词
flexible job shop scheduling problems,manufacturing systems,resource usage,completely automated environment,transport system,task dependencies,production machines,optimal joint schedule,production line,conveyor belt,heuristic based model,randomization process,SCHED-T
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要