Bandpass Negative Group Delay Analysis of VIuShaped Trace Crosstalk Effect
2022 IEEE INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY & SIGNAL/POWER INTEGRITY, EMCSI(2022)
摘要
This paper investigates on the bandpass (BP) negative group delay (NGD) effect from printed circuit board (PCB) trace crosstalk. The designed and prototyped PCB proof-of-concept (POC) is constituted by arbitrary traces of Vlu-shaped coupled lines ended by radial open stubs. The BP-NGD function is characterized by the basic qualification parameters as the NGD value, center frequency and bandwidth. The influence of the u- and V-shape trace physical parameters on the main interconnect I-line is illustrated by sensitivity analyses. The Vlu POC BP-NGD behavior is validated by simulation and measurement. The BP NGD analysis reveals the PCB trace crosstalk effect with the apparition of dual-band response characterized by NGD value-center frequencies of about (-1 ns, 2.43 GHz) and (-1 ns, 2.58 GHz).
更多查看译文
关键词
Negative group delay (NGD),Bandpass (BP),NGD function,PCB trace crosstalk,BP-NGD experimentation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要