Ams, historical, and archaeological dating of oponice castle

RADIOCARBON(2023)

引用 0|浏览4
暂无评分
摘要
The fifth season of excavations of Oponice Castle in 2020 was located in the lower castle's courtyard. The research led to discovery of an original clay floor being heavily burned with charred plank and a rectangular stone-brick construction. The construction has collapsed upper part with a fallen low brick arch. The whole area was covered with numerous stove tiles and one clay mold for the production of stove tiles. The construction was identified as a pottery kiln dated to the second half of the 16th until the first half of the 17th century AD by the findings from excavated layer identified to the kiln destruction. Also, written sources mention a large fire in 1645 which destroyed the castle. The aim of this article is to use different methods of dating and refine the chronology of the context through microarchaeology and Bayesian modeling. For these purposes different types of samples were collected. The sampling focused on site formation process determination of pottery kiln use and the way of its destruction. Applying Bayesian analysis improved overall dating, through modeled time interval of the three individual sequences and helped recreated historical events during the period, when the calibration curve fluctuates.
更多
查看译文
关键词
archaeological dating,historical
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要