Allocation of Battery Energy Storage Systems (BESS) to Mitigate FIDVR in the Con Edison Transmission Systems

Chang Chen,Yilu Liu, Resk E Uosef, Matthew Koenig, Constantine Spanos

2023 IEEE PES GTD International Conference and Exposition (GTD)(2023)

引用 0|浏览5
暂无评分
摘要
Fault-Induced Delayed Voltage Recovery (FIDVR) is an unexpected time delay in the recovery of voltage to its nominal value following the normal clearing of a fault. Typically, the delay can last seconds to tens of seconds, which has attracted attention as a significant issue in power systems. Inverter-based renewables such as battery energy storage systems (BESS) show the potential to provide voltage support during FIDVR events. This paper studies the optimal allocation of BESS to mitigate FIDVR in Con Edison of New York, including the BESS control strategy, BESS size, and BESS locations. The study is carried on by means of computer simulations in Siemens PTI software PSS/e.
更多
查看译文
关键词
Fault-Induced Delayed Voltage Recovery (FIDVR),battery energy storage systems (BESS),PSS/e simulation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要