Job-Deadline-Guarantee-Based Joint Flow Scheduling and Routing Scheme in Data Center Networks

Long Suo, Han Ma,Wanguo Jiao,Xiaoming Liu

SENSORS(2024)

引用 0|浏览1
暂无评分
摘要
Many emerging Internet of Things (IoT) applications deployed on cloud platforms have strict latency requirements or deadline constraints, and thus meeting the deadlines is crucial to ensure the quality of service for users and the revenue for service providers in these delay-stringent IoT applications. Efficient flow scheduling in data center networks (DCNs) plays a major role in reducing the execution time of jobs and has garnered significant attention in recent years. However, only few studies have attempted to combine job-level flow scheduling and routing to guarantee meeting the deadlines of multi-stage jobs. In this paper, an efficient heuristic joint flow scheduling and routing (JFSR) scheme is proposed. First, targeting maximizing the number of jobs for which the deadlines have been met, we formulate the joint flow scheduling and routing optimization problem for multiple multi-stage jobs. Second, due to its mathematical intractability, this problem is decomposed into two sub-problems: inter-coflow scheduling and intra-coflow scheduling. In the first sub-problem, coflows from different jobs are scheduled according to their relative remaining times; in the second sub-problem, an iterative coflow scheduling and routing (ICSR) algorithm is designed to alternately optimize the routing path and bandwidth allocation for each scheduled coflow. Finally, simulation results demonstrate that the proposed JFSR scheme can significantly increase the number of jobs for which the deadlines have been met in DCNs.
更多
查看译文
关键词
data center networks,cloud computing,coflow,flow scheduling,deadline
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要