Optimal Design and Operation of Long-Distance Deep-Water HVAC Transmission for Offshore WECS Integration with FPSO Unit

2024 IEEE Applied Power Electronics Conference and Exposition (APEC)(2024)

引用 0|浏览0
暂无评分
摘要
This paper evaluates the technical feasibility of integrating an offshore Wind Energy Conversion System (WECS) to a Floating Production Storage and Offloading (FPSO) unit. The WECS is situated closer to the Brazilian mainland, requiring a 150 km long subsea umbilical cable for the integration with the FPSO unit. Given the substantial water depths, High Voltage Alternating Current (HVAC) transmission becomes mandatory, which introduces challenges such as power losses and high reactive capacitive current generated by the cable. To address these challenges, the paper proposes a comprehensive approach. Firstly, the umbilical cable section is sized based on ampacity and maximum current under short-circuit conditions. Subsequently, a power flow optimization technique is employed to determine the optimal transmission voltage that minimizes power loss. Such an optimization process also requires that the WECS absorbs reactive power according to the active power being processed. These power values obtained from the optimization are thus used for a lookup table control to optimize the efficiency of the entire transmission system. To validate the proposal, each component of the system is modeled, and a complete simulation is conducted using MATLAB-Simulink.
更多
查看译文
关键词
FPSO unit,deep-water HVAC Transmission,offshore WECS,subsea umbilical cable
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要