谷歌浏览器插件
订阅小程序
在清言上使用

Time-dependent behavior of vertically loaded rock-socketed piles in multilayered saturated viscoelastic rock-soil mass

Computers and Geotechnics(2024)

引用 0|浏览10
暂无评分
摘要
This paper studies the time-dependent behavior of a pile drilled in layered saturated viscoelastic rock-soil mass due to a vertical load. By virtue of the finite element method (FEM), the pile is discretized into three-node axial bar elements. On the basis of the consolidation solution of layered transversely isotropic saturated rock-soil mass, the fractional Poyting-Thomson model and fractional Merchant model are used to simulate the rheological properties of rock and soil, respectively. The viscoelastic solution of layered saturated rock-soil mass under annular linear loads is derived according to the elastic–viscoelastic correspondence principle. Taking the above solutions as the kernel functions of the boundary element method (BEM), and combining with the stiffness matrix equation of a pile, a coupling formula of pile-soil-rock interaction is further established by the FEM-BEM coupling method. A MATLAB code is developed for numerical calculation, and the correctness of the present theory and calculation method are verified by comparing with the existing solutions, field tests and ABAQUS analyses. Finally, the key factors influencing the time-dependent behavior of piles are in-depth discussed.
更多
查看译文
关键词
Time-dependent behavior,Viscoelastic rock-soil mass,Elastic-viscoelastic correspondence principle,FEM-BEM coupling method,Pile-soil-rock interaction
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要