An Improved Random Forest-Based Operation Duration Prediction of Long-Distance Tunnel Construction Considering Geological Uncertainty
JOURNAL OF COMPUTING IN CIVIL ENGINEERING(2025)
Key words
Tunnel construction,Operation duration prediction,Geological uncertainty,Random forest (RF),Whale optimization algorithm (WOA)
AI Read Science
Must-Reading Tree
Example

Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined