ATCO Electric is an electric utility company. Based in Edmonton, Alberta, ATCO Electric transmits and distributes electricity to two thirds of Alberta, namely in north and east-central Alberta, as well as communities in Yukon and the Northwest Territories.
Carbon dioxide capture and utilization (CCU) and Power-to-X (PtX) technologies are increasingly viewed as key enablers of net-zero energy systems, particularly for decarbonizing sectors where direct electrification remains challenging. While a rapidly expanding literature has examined individual CCU and PtX processes, existing reviews largely adopt technology-centric perspectives with inconsistent system boundaries and assumptions, limiting comparability and obscuring system-level climate relevance. This review addresses this gap by providing an integrated, system-level synthesis of CO2 capture, utilization, and Power-to-X pathways for sustainable fuels and energy systems. Building on a harmonized analytical framework, the review evaluates major capture routes, utilization pathways, and synthetic fuel options under consistent assumptions, with particular emphasis on energy demand, net CO2 reduction, and sensitivity to electricity carbon intensity. The analysis demonstrates that overall performance is governed less by component-level efficiencies than by a small set of dominant system drivers, notably electricity carbon intensity, hydrogen demand, and CO2 source characteristics. Results reveal substantial trade-offs between energy input, carbon mitigation potential, and deployment robustness, highlighting that CCU–PtX pathways are inherently context-dependent rather than universally beneficial. By consolidating fragmented insights into a unified decision-oriented framework, this review clarifies where and under what conditions CCU–PtX technologies can deliver meaningful climate benefits. The findings provide actionable guidance for researchers, industry, and policymakers seeking to deploy CCU–PtX pathways strategically within net-zero energy transitions.
An alternating current (AC) interference study was conducted in 2019 following a utility development with a new substation and 24 km of powerline upgrades in Alberta, Canada. The study comprised six powerlines by one utility and eight pipelines by two operators. Computer modelling showed voltage hazards under steady-state and fault conditions, susceptibility to AC corrosion, and high coating stress in the unmitigated state. A shared AC mitigation system was designed to eliminate these hazards while reducing mitigation requirements, site visits, construction footprint, environmental impact, and project costs. This article describes the design, installation, commissioning, and benefits of the shared mitigation system.
Flexible ac transmission systems (FACTS) have secured a market share in both transmission and distribution system operational improvements, going from concept to a viable tool in the past four decades. The STATCOM, nowadays being one of the most common shunt-connected FACTS, has matured in this timeframe and is now being employed by many distribution system operators. In this context, its typical application is the mitigation of rapid voltage changes, which are the main cause of voltage flicker. While the relatively low X/R characteristic of a distribution system is not conducive to maximizing the effectiveness of this device, distribution STATCOMs can still be very effective in meeting power quality standard requirements of most distribution systems if planned adequately. This paper presents a real case study deployment of a Distribution-STATCOM in a rural distribution feeder to mitigate rapid voltage changes caused by a nearby industrial park. The presented study demonstrates typical Distribution STATCOM response times are sufficiently fast to mitigate rapid variations, for both load varying and interharmonic caused flicker.
An alternating current (AC) interference study was conducted in 2019 following a utility development project that included constructing a new substation and upgrading approximately 24 km of new AC transmission powerline sections in Alberta, Canada. The study comprised six transmission powerlines owned by one utility and eight pipelines owned by two different operators. The modelling results showed touch voltage hazards under steady-state and fault conditions and susceptibility to AC corrosion and coating stress above the established limits in the unmitigated state. A shared AC mitigation system was designed to eliminate the hazards caused by AC interference on all eight pipelines. This approach reduced overall mitigation requirements, number of site visits, construction footprint, environmental impact, and project costs. This paper describes the mitigation system's design, installation, and commissioning and discusses the benefits of a shared AC mitigation system approach.
Reliable protection and grounding schemes have been well established for power systems. With the advent and proliferation of microgrids, however, these subjects need to be revisited as traditional philosophies are no longer sufficient to cope with reduced short circuit levels of distributed energy resources (DERs). A DER dominated microgrid will experience a limitation in the functionality of traditional overcurrent elements. This can degrade protection coordination and selectivity and requires a philosophy that is nonstandard in distribution systems. Furthermore, with most DERs operating as constant current sources and not naturally supplying ground current, performance grounding also becomes a fundamental problem of microgrids. Additional ground sources are required and must be appropriately sized for the needs of the microgrid. This paper proposes a practical protection and grounding scheme for an isolated microgrid that is being retrofitted with a large solar facility and a battery energy storage system (BESS). Much of the theory was developed tailored for this system and serves to reinforce the need for new philosophies that consider practical aspects of real systems.