• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
      MCP&Skill
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    C

    Construction Development (Qatar)

    企业EST. 1982
    320论文总数
    2,630引用总数

    论文量&引用量时间轴

    机构学者

    论文(320)

    年份
    起
    –
    止
    排序
    1Stress Corrosion Cracking Behavior of Low-Carbon Steel Anchor Bolts in a Carbonaceous Mudstone Corrosive Environment
    Xiang Qiu, Kun Ou, Yang Li, Lin Li, Yixiang Yin, Changrui Chen

    To determine the mechanism of the continuous deterioration of the mechanical properties of low-carbon steel anchor bolts in a corrosive carbonaceous mudstone environment, slow strain rate tensile (SSRT) tests, electrochemical tests, and microscopic tests of low-carbon steel anchor bolts in a corrosive carbonaceous mudstone environment were carried out. The effects of tensile speed and temperature on the stress corrosion cracking (SCC) susceptibility of low-carbon steel anchor bolts in deionized water and a carbonaceous mudstone corrosive environment were studied. The SCC behavior and corrosion mechanism of the low-carbon steel anchor bolts were analyzed. The results show that SCC occurs in low-carbon steel anchor bolts under the combined action of stress, temperature, and the corrosive environment of carbonaceous mudstone. The tensile speed and temperature sensitivity to stress corrosion were 5x10-5 mms-1 and 40 degrees C, respectively. The fracture of the low-carbon steel anchor bolts in the corrosive environment of the carbonaceous mudstone exhibited a mixed fracture mode of ductile fracture and brittle fracture. In the elastic stage, the anodic dissolution rate of the low-carbon steel anchor bolts accelerated, which accelerated the stress corrosion reaction. In the yield and hardening stages, the corrosion products accumulated to form a corrosion product film, isolate the steel substrate, and reduce the stress corrosion rate. When the necking stage was reached, the passive crack was transformed into an active crack, the stress corrosion reaction intensified, and the tensile properties of the steel bar significantly decreased. The corrosion products of the low-carbon steel anchor bolts in carbonaceous mudstone were mainly alpha-FeOOH, gamma-FeOOH, beta-FeOOH, Fe3O4, and Fe3SO4. This study can provide an important reference for corrosion behavior analysis and corrosive solution research on anchor bolts in a carbonaceous mudstone slope environment.

    2025JOURNAL OF MATERIALS IN CIVIL ENGINEERING(2025)引用:1
    引用
    AI阅读
    加入学术空间
    2Research on Road Performance of Rubber Powder Modified Asphalt Steel Slag Mixture Based on Multisource Solid Waste Recycling
    Huibin Wang, Jiancheng Zhang,Yang Luan, Huilin Meng, Chao Sun
    2025Sixth International Conference on Green Energy, Environment, and Sustainable Development (GEESD 2025...(2025)
    引用
    AI阅读
    加入学术空间
    3Risk Management As a Dynamic and Continuous Process in the Life Cycle of a Typical Major Civil Engineering Project
    Dawa Tshering

    While many construction industries acknowledge the importance of risk management policies but hardly do they implement a defined technique in risk management. Many construction practitioners employ linear risk management process by applying risk mitigation process as and when risk occur. When project managers and practitioners ignore the application of risk management in real time projects, the implications are almost usually observed in the projects through forced variations, scope change and high uncertainties. In a complex and major civil engineering project, the risk exposure environment changes and shifts constantly due to external factors, changing objectives and other multiple dynamic variables. Quite often, initially planned risk mitigation targets do not generate intended outcome due to inadequate application of risk assessment process. For this reason, the risk and uncertainty management must be continuous, holistic and real time throughout the project life cycle from inception to completion. The ultimate goal of risk management plan is to achieve the project objectives in terms of cost, quality and time. Thus, risk management in complex and major civil engineering projects must be applied in real time, continuously and with utmost importance.

    2023Bhutan Journal of Research and Development(2023)引用:1
    引用
    AI阅读
    加入学术空间
    4Analysis of Two Kinds of Rheological Properties Data of Asphalt
    Chengxin Chen,Hui Lin, Zixia Li

    In order to study the rutting factor G*/sin δ and complex shear modulus G*, two kinds of rheological performance data obtained under asphalt temperature scanning, this paper performs regression analysis on the relevant empirical formulas of these two kinds of data, using the determination coefficient R2 and the comparison of the numerical magnitude of the fitted and true values of the regression against the error value Δ, and selects a reasonable formula for the next analysis and research, and uses a small number of known measurement point data of two different temperature spans for regression analysis, and compares the numerical magnitude of Δ, so as to discover and analyze the law.The results show that the fitted and true values of the commonly evaluated formula: lg lg G* = GTSF ∙ lg T + C2 for the complex shear modulus G* have relative error values E of many data above 6.4%, which do not meet the specification requirements, but the Z as well as X of the formula lg(F) = A ∙ T + C (F can refer to G*/sin δ or G*) under the regression of the same data are below 6.4%, which are more satisfying to use for research;At the same time, using Equation lg(F) = A ∙ T + C in the commonly used asphalt high temperature evaluation interval (50–80) for a deeper research analysis, it was found that a number of data in Δ obtained by regression analysis using three known measurement points with a temperature span of 15°C (50°C, 65°C, 80°C) were more than 6.4%, which did not meet the specification requirements; while using four measurement points with a temperature span of 10°C (50°C, 60°C, 70°C, 80°C) are all below 6.4%, which meet the specification requirements.

    2023Advances in Transdisciplinary Engineering Advances in Frontier Research on Engineering Structures(2023)
    引用
    AI阅读
    加入学术空间
    5Intelligent Cooperative Optimization Control of Earth Pressure Balance of Shield Machine Based on Convolutional Neural Networks and Heuristic Dynamic Programming
    Xuanyu Liu,Xinyang Gan,Cheng Shao,Yudong Wang,Qiumei Cong

    The earth pressure balance (EPB) shield machine is a major engineering tool for underground excavation. During the shield excavation process, it’s particularly important to ensure that the EPB at the excavation face. In order to maximize the use of construction data information to reflect the dynamic changes in the working conditions and parameters during the construction of the shield, to better ensure the EPB at the excavation face, this study proposes an intelligent cooperative optimal control method Convolutional Neural Network (CNN) and Heuristic Dynamic Programming (HDP) -based for EPB shield machine. CNN is used as the basis for constructing the execute network, model network and evaluation network of the CNN-HDP controller, and updating weights by small batch gradient descent. The residual network (ResNet) was introduced into CNN to effectively solve the problem of degraded network performance and slowly disappearing gradients in CNNs due to increasing network complexity. By means of a minimum pricing function, the execute network updates the control variables using the error of the evaluation network to obtain the best total thrust, screw conveyor torque, screw conveyor speed and advance speed. The final results of simulation experiments based on field construction data show that the method effectively controls the EPB of the sealed compartment with extreme immunity to interference.

    2023
    引用
    AI阅读
    加入学术空间
    立即登录,查看全部 320 篇论文

    机构统计