Global Marine Group is a British-headquartered specialist provider of installation, maintenance and repairs of submarine communications cable for the telecommunications, oil & gas and deep sea research industries.Global Marine provides engineering and underwater services in response to the subsea cable installation, maintenance and burial requirements of their customers around the world. With a fleet of vessels, ROVs and specialised subsea trenching and burial equipment, Global Marine works in the Oil & Gas, Telecom and Deep Sea Research sectors.Global Marine, the legacy of Cable & Wireless Marine and British Telecom Marine, was purchased by Global Crossing in 1999, at which time it received the name it carries today. In 2004 Global Marine Systems was purchased by Bridgehouse Marine and was completely restructured. In September 2014 Global Marine was acquired by HC2. Historically, the company has a legacy of over 160 years of cable installation, stemming from the first telegraph cables laid in the 1850s.[citation needed]Global Marine has a worldwide presence, with offices in Chelmsford, UK and Singapore; depots in Portland, UK; Bermuda; Victoria, Canada; Batangas, Philippines and Batam, Indonesia; Ships are stationed around the world to support both installation of new cables and the maintenance and protection of existing cables. The company is also involved in joint ventures with China Telecom and Huawei.Since 2002 Global Marine has become increasingly active in the installation of submarine power cables and gained significant market share in the European Offshore Renewables market, in addition to undertaking a number of large power interconnect projects. The company was responsible for installing the cables connecting the turbines on a host of windfarm projects including Blythe (one of the first trial farms), Horns Rev 1 (the first major commercial windfarm in Denmark), Thornton Bank, Kentish Flats and others. To support this business Global Marine formed a subsidiary in 2011 called Global Marine Energy. The development of the energy business included the opening of a new office in Middlesbrough and the construction of a specialist vessel, Cable Enterprise. The subsidiary company was sold to Prysmian Group, the world’s largest cable manufacturer at the time of sale, in September 2012.Global Marine today focuses primarily on supporting the telecoms, oil & gas and deep sea research markets..
The coral reefs of the Pitcairn Islands are in one of the most remote areas of the Pacific Ocean, and yet they are exposed to the impacts of anthropogenic climate change. The Pitcairn Islands Marine Protected Area was designated in 2016 and is one of the largest in the world, but the marine environment around these highly isolated islands remains poorly documented. Evidence collated here indicates that while the Pitcairn Islands' reefs have thus far been relatively sheltered from the effect of warming sea temperatures, there is substantial risk of future coral decalcification due to ocean acidification. The projected acceleration in the rate of sea level rise, and the reefs' exposure to risks from distant ocean swells and cold-water intrusions, add further uncertainty as to whether these islands and their reefs will continue to adapt and persist into the future. Coordinated action within the context of the Pitcairn Islands Marine Protected Area can help enhance the resilience of the reefs in the Pitcairn Islands. Options include management of other human pressures, control of invasive species and active reef interventions. More research, however, is needed in order to better assess what are the most appropriate and feasible options to protect these reefs.
Global Marine Systems and ABB worked together to install the subsea cable, Gjøa, that brings electricity from the Mongstad refinery, north of Bergen, Norway, to the floating production platform in the North Sea. Gjøa is the first floating platform to have power supplied by a direct link from the shore. The installation of the power cable was successfully completed on 17 May 2010 and the cable went live on 11 July 2010. This paper outlines the cutting-edge techniques that were used in the cable installation and which will bring benefits to offshore structure developments, such as wind farms, that will be vital for the next generation of developments.
Since the early 1980's there have been significant advances in remotely operated vehicle (ROV) intervention for effective cable burial and maintenance. The early generation ROVs were primarily designed to undertake an inspection and repair function only and had limited capability for the burial of final splices and repair bights. More recently, the work scope of cable intervention ROV systems has been extended to undertake significant portions of post lay burial of cable systems. This paper charts some of the historical events and advances which have led to a generation of new vehicles which are significantly advanced in technological terms compared to their earlier counterparts. It is however worth noting that many of the old systems still remain in use today and SCARABs I and II are still in use some 13 years since first being built.< >
This paper outlines recent developments which have been undertaken to improve techniques for effective cable burial and protection of subsea pipes. Traditional methods of burial for subsea pipework have involved the use of towed plough systems, subsea dredging units, or mechanical or jetting based trenching systems. Recent vehicle developments as undertaken by BT (Marine) Limited (BT(M)) have embodied new techniques which will allow more efficient solutions for the pipeline owners. New vehicles now offer a hybrid of solutions depending on the local conditions which may prevail. For example, the new BT(M) Eureka vehicle has the ability to interface to four separate burial devices. There is a new advanced dynamic jetting system which maximises available power for efficient trenching. There are two separate mechanical tools; a rockwheel cutter for work in very hard seabed materials, and a chain excavator where very deep burial, in excess of 2m, is required. There is also a jet assisted plough which combines the benefits of water jetting with ploughed systems. All of these burial devices are controlled from the same host vehicle which is fitted with the latest sensing and tracking devices. Product handling is of prime importance and the new vehicle systems operate with either a non-product engagement system during burial, or an auto eject facility which ensures that in the event of hydraulic failure the product is safely ejected from the vehicle. At present the burial vehicles have been designed to handle small diameter rigid pipes and flexibles. However, R&D studies have already proved the concept can be extrapolated for larger diameter pipes.