Infrastructure Canada (INFC)[NB 1] is a department of the Government of Canada responsible for the federal public infrastructure policy. Construction and development of infrastructure is primarily the responsibility of provincial/territorial and municipal governments, as such, much of the department's work involves co-financing projects with other levels of government.The department is responsible to Parliament through the minister of intergovernmental affairs, infrastructure and communities.
Background The growth of urban dwelling populations globally has led to rapid increases of research and policy initiatives addressing associations between the built environment and physical activity (PA). Given this rapid proliferation, it is important to identify priority areas and research questions for moving the field forward. The objective of this study was to identify and compare research priorities on the built environment and PA among researchers and knowledge users (e.g., policy makers, practitioners). Methods Between September 2022 and April 2023, a three-round, modified Delphi survey was conducted among two independent panels of international researchers ( n = 38) and knowledge users ( n = 23) to identify similarities and differences in perceived research priorities on the built environment and PA and generate twin ‘top 10’ lists of the most important research needs. Results From a broad range of self-identified issues, both panels ranked in common the most pressing research priorities including stronger study designs such as natural experiments, research that examines inequalities and inequities, establishing the cost effectiveness of interventions, safety and injuries related to engagement in active transportation (AT), and considerations for climate change and climate adaptation. Additional priorities identified by researchers included: implementation science, research that incorporates Indigenous perspectives, land-use policies, built environments that support active aging, and participatory research. Additional priorities identified by knowledge users included: built environments and PA among people living with disabilities and a need for national data on trip chaining, multi-modal travel, and non-work or school-related AT. Conclusions Five common research priorities between the two groups emerged, including (1) to better understand causality, (2) interactions with the natural environment, (3) economic evaluations, (4) social disparities, and (5) preventable AT-related injuries. The findings may help set directions for future research, interdisciplinary and intersectoral collaborations, and funding opportunities.
The Samuel De Champlain Bridge is one of the busiest bridges in North America. With over $20 billion Canada-US trade crossings annually, it is vital to Canada’s international trade partnership. Spanning the St. Lawrence River in Montreal, this lifeline structure faces unique hazards including extreme cold climate conditions, ice abrasion, ice-accretion on stays, de-icing salt attacks, wind, vessel collision, scour, and seismic activity, while meeting the required design life of 125 years. This paper discusses the holistic approach adopted to achieve the project’s sustainability and durability objectives. The project started with extensive environmental assessments, implemented design strategies to minimize environmental impacts, and employed a comprehensive durability plan and a structural maintenance plan. The Samuel De Champlain Bridge received the PLATINUM ENVISION® award for Sustainable Infrastructure Project.
14.00 In a significant government building a living wall was installed as part of a major renovation. The wall is two storeys high and the upper storey opens up to two large meeting rooms. When it used for meetings the noise from the irrigation system of the living wall interferes with the speech communication of attendees. The rooms have extensive glazing and exposed natural stone walls. The ceiling is of irregular shape with acoustical treatment and the floor is carpeted. The challenge is to devise a solution that will address the noise problem as well as ensure continued health of the plants as well as the operation of the rooms and esthetics. Several measurements were performed as well as acoustical modelling to explore possible solutions. The other factor to consider in modelling is that the wall does not act as a point source but rather a series of line sources. The results of the modelling and how the measured data fits will be presented. The noise is primarily related to the flow rate of the irrigation system. An empirical derivation of noise with flow rate is about 50*log10(flow rate). The results provide one with understanding of the possible challenges of such installations and the design considerations that can help alleviate noise issues after the wall is operating. Normal 0 false false false EN-CA X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:Table Normal; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:Calibri,sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Times New Roman; mso-bidi-theme-font:minor-bidi; mso-fareast-language:EN-US;} https://awc.caa-aca.ca/index.php/AWC/awc17/author/saveSubmit/3
A rapidly deteriorating condition of the existing Champlain Bridge in Montreal, led the Government of Canada to accelerate its replacement and ultimately award a $3.98 billion CDN contract to Signature on the Saint Lawrence Group to deliver a new replacement crossing.Entailing a 3.4 km long structure over the St. Lawrence River with some 193,000 m2 of new deck construction, the works represent one of the largest infrastructure projects currently underway in North America and will produce Canada’s biggest bridge.The first of six related papers submitted to this symposium, this paper explains the need for an accelerated schedule, describes the delivery method used, summarizes the imposed requirements to ensure delivery of a highly durable structure (125-year design life) and key architectural features of the bridge required to endow Montreal with an elegant world class transportation infrastructure.