• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    I

    Ivanhoe Energy (Canada)

    企业EST. 1980
    1论文总数
    3引用总数

    论文量&引用量时间轴

    机构学者

    排序
    brendan ohara
    brendan ohara
    Husky Energy Inc
    论文:1引用:0H-index:0
    Ramsey W. Jones
    Ramsey W. Jones
    Husky Energy (Canada)
    论文:1引用:0H-index:0

    论文(1)

    年份
    起
    –
    止
    排序
    1SAGD-Pair Performance Optimization: A Field Case Study of Recovery Enhancement
    Kamran R. Jorshari,Brendan O'Hara,Ramsey W. Jones

    Summary Performance of fields under thermal recovery processes has been improved considerably by experimenting with new techniques and innovative operational solutions in heavy-oil and extra heavy oil fields (Butler 1994; Singhal et al. 1998). By far, steam-assisted-gravity-drainage (SAGD) and cyclic-steam-stimulation (CSS) methods have been the most compelling and have shown a successful history in these oil fields (Butler et al. 2000; Butler 2001). At the Celtic heavy-oil field, Husky Energy experienced three phases of optimization over the course of 10 years of recovery. The Celtic field consists of 28 SAGD pairs located in the Lloydminster heavy-oil region that have been in service since 2001. Among these pairs, there are three SAGD pairs (F Pad East) with early productivity challenges in addition to downtime caused by sand production. Following new geological realization and reservoir studies, the injector wells were converted to production wells performing a horizontal CSS process. In 2008, and in an effort to maintain production, a detailed numerical-simulation study was conducted to compare different steam support configurations and the result was justified for field execution. The outcome resulted in four directional steam-injection wells (G Pad) permanently started to support the current horizontal producers. In 2009, the new configuration commenced and is still in operation today. Communication with horizontal wells has been confirmed on one side of the pattern, and it has been extending gradually to the other side as it was investigated in other work (Edmunds 1991; Al-Salhi et al. 1997). Recently, acquired field data suggest that the process is exceeding the expected oil profile and its steam consumption is less than anticipated. The geological review, history of the F Pad East pairs, results of numerical-simulation study, and recommendations are presented in this paper.

    2013JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY(2013)引用:3
    引用
    AI阅读
    加入学术空间

    合作机构(1)

    Husky Energy (Canada)合作论文 1

    机构统计