The kilometer scale rail-road suspension bridge is subjected to environmental thermal actions, causing significant temperature-induced effects on the rail track alignment and the rail-track vertical irregularity exceeding the threshold during operation. This paper investigates the temperature distribution and associated responses of a rail-road suspension bridge through a combination of structural health monitoring (SHM), on-site tests, and numerical analysis. Based on the SHM, a strong linear relationship between the ambient temperature and the temperature-induced effects on the girder was observed. It is concluded that the long-term temperature-induced effects can cause an overall temperature variation in the structure with the main factor being the girder deflection. Then, the long-term temperature-induced deflection of the mid-span can reach up to 30 mm/C. The on-site test results also indicate that the absolute elevation of the rail track has good followability relative to the girder, and dramatic temperature fluctuations can significantly influence rail-track irregularity. Based on measurements of the ambient temperatures and the adoption of a solar radiation model, the time-dependent temperature distribution and the temperature-induced deflections were calculated through a coupled thermomechanical method. Moreover, the dramatical variations of ambient temperature were then put into the numerical model to obtain the deflections of girder and chord offset values of the rail track. Results show that the dramatic variations of ambient temperature have exerted significant impacts on the rail-track irregularity on the bridge. These findings can provide an improved recommendation for maintaining rail-track operating performance during operation.
This study proposes an equivalent crack life prediction method for root cracks in T-welded joints. An equivalent initial defect is used to describe the severity of the weld defect. Fatigue life prediction is achieved based on equivalent fracture parameters and high-stress fatigue life reference points fitted to obtain a P-S-N curve for the entire stress range. Taking the 6082-aluminum alloy T-welded joints as the object, the test data under tensile load P-S-N curve fitting and crack growth simulation were carried out to compare and verify the applicability under constant and equivalent spectral load. This method enables deterministic fatigue life prediction with less testing and cost. Meanwhile, the approach incorporates the uncertainty of the physical model of the weld into the P-S-N curve, simplifying the process of calculating the probabilistic fatigue life.
To better understand the randomness of the derailment factor of the high-speed trains, its probability distribution function (PDF) and extreme value PDF are studied using the identical probability distribution evolution method (IPDEM). The standard deviation and mean of wheel-rail contact forces are obtained by pseudo-excitation method (PEM) and time history simulations. Then, based on the mean and standard deviation, the PDF and extreme value PDF of the derailment factor are obtained by IPDEM. The PDF and extreme value PDF of the derailment factor are validated by Monte Carlo method (MCM) simulations. Using a 6-car Pioneer EMU train passing over a 3-span 32-m long simply supported bridge as a case study, the applicability of the PDF and extreme value PDF of the derailment factor under varying train speeds, different track irregularities and different bridge deflection/span ratios are discussed. Finally, experimental data obtained from a field test are also used to verify the accuracy of the theoretical approaches. The results show that the PDF and extreme value PDF of the derailment factor proposed in this paper can provide a foundation for statistical evaluations.
由于我国高速铁路系统一般在夜间进行检修作业,故动车所对动车组最晚离所时间会有一个限制,避免某些列车受检修天窗的影响而长时间停站.在编制动车组交路计划时考虑此类约束条件,将大幅增加模型的求解难度.本文针对该问题,将动车组最晚离开动车所时间、一级检修里程周期和时间周期作为约束条件,分析动车组交路的优化目的,以动车组接续总时间和动车组交路总损失里程最小化为目标,基于列车接续网络图,建立离所时间约束下的动车组交路计划优化模型.结合模型的特点及其复杂性,设计求解模型的模拟退火启发式算法.并以太原南动车所的46个列车车次为例,分别在不考虑离所时间约束和考虑离所时间约束两种场景下,生成动车组交路优化方案.结果表明:在动车组交路个数、接续总时间和平均运行里程等指标几乎相同的情况下,实现了离所时间约束,使得交路计划更加符合运输生产实际需求.
针对传统双稳杜芬随机共振SR的输出饱和及噪声能量转换不足的问题,引入张角系数控制下的线性分段势阱函数,以抑制SR系统的输出饱和现象,采用非对称势阱函数扩大布朗粒子在单边势阱内的振荡范围,以增加SR输出幅值.结合非线性SR系统最佳耦合方式,构建非饱和-非对称二维SR系统,该系统的4个三维势阱的动力学特性丰富,势阱宽且陡峭度低,布朗粒子的振荡范围较大.采用多尺度简化粒子群优化算法,对构建的非饱和-非对称的二维SR系统进行多参数同步优化,进一步提高粒子在势阱内迁移向上的运动能量.仿真试验与高速铁路轴箱轴承的故障试验结果表明:所提出的优化耦合SR系统,能够显著增强特征信号幅值,提高噪声的利用率,在轴承早期损伤检测中具有突出优势.