Buildings represent significant investment of developers and, as such, it is important to ensure value for the capital injected into the construction of buildings. Unfortunately, due to neglect of proper construction practices, buildings are facing defects, and one of such defects is rising damp. This study sought to identify some of the construction practices contributing to rising damp in buildings and their effects and suggest some remedial measures for controlling and treatment of rising damps. Snowball sampling and purposive sampling techniques were used to gather data from a cross section of 78 building environment professionals in Kumasi and Ejisu who have experienced the effects of moisture rise. Relative Importance Index was used to rank the significance of the causes. The study revealed that failure to use damp-proof membrane or course, presence of groundwater, porosity of masonry, and concrete element sand flooding were the main causes of rising damp. Undersetting and saw slotting, making good plumbing leakages, using approved waterproof chemical injection, and application of admixtures were the main measures recommended to avert rising damp.
This study was aimed at examining the relationships between the effectiveness of safety intervention programmes and implementation strategies in the Nigeria construction industry. Structured questionnaires were distributed to construction stakeholders across some selected states in Nigeria and the data generated were analysed using Pearson’s product moment correlation. The study found that the effectiveness of safety intervention programmes for construction site accidents prevention is significantly related to the communication implementation strategies. Based on the principles of social ecological theory and UNICEF’s communication for development strategies, this study developed a multilevel safety intervention implementation strategy for construction industries in Nigeria. Four communication strategies, namely, advocacy, social mobilisation, social change communication, and behaviour change communication, which are central to the effectiveness of safety intervention implementation programmes for construction site accidents prevention, were identified. It further revealed that these communication strategies could be individually and collectively applied at different intervention levels but that the greatest effect would be felt when all strategies are systematically combined with more efficient use of resources. The study recommended systematic actions by policy makers, construction organisations, and various community groups towards construction safety interventions, since maximum effect could only be felt when safety interventions are implemented across all levels.
Continuous girder bridges become increasingly popular because of the rapid development of highway throughout the world. Most of previous researches on vibration analysis of a multispan continuous bridge subject to complex traffic loading and vehicle dynamic interaction focus on the girder displacement not considering braking effects. In current literature, few studies have discussed the effects of braking on continuous girder bridges. In this study, we employ the finite element method (FEM) to investigate the dynamic response of continuous girder bridge due to three-axle vehicle. Vertical reaction forces of axles that change with time make bending vibration of girder increase significantly. The braking in the first span is able to create response in other spans. In addition, the dynamic impact factors are investigated by both FEM and experiments on a real bridge structure. The results of this study extend the current understanding of the bridge dynamic behaviors and can be used as additional references for bridge codes by practicing engineers.
People-centered innovation is a paradigm shift in the construction industry. It is derived from the supposition that people not methods, schedules, or budgets deliver projects. Our data suggest that a multilevel, multidisciplinary project team through shared vision, values, and a common vernacular defines, designs, and delivers more successful projects than traditional methods. These projects meet the needs of shareholders, the community, stakeholders, and the planet. We employ the concepts of emotional intelligence and agency theory to explain an integrated project delivery (IPD) construction project using lean tactics that not only delivered, but also exceeded expectations resulting in a six-month schedule acceleration and $60M savings over the original estimated cost of the project calculated assuming traditional project delivery methods. The safety rating for this project was 50% better than the national average and the expected improvement in operating margin for the new building is 33% greater. This paper introduces the notion of people-centered innovation to an industry that has struggled to adapt and show positive results over recent decades. Our case study describes the significance of people-centered innovation in construction project delivery. We discuss the implications for the construction industry going forward.
The Ghanaian concrete industry is really a booming industry due to many infrastructural developments and the surge in residential development. However, many developmental projects that utilize concrete do suffer from the negative impact of moisture rise including paint peeling-off, bacterial and fungi growth, and microcracks as well as unpleasant looks on buildings. Such negative outlook resulting from the effects of moisture rise affects the longevity of concrete and hence makes concrete less sustainable. This study seeks to develop materials that could minimize the rise of moisture or ions through concrete medium. The experimental works performed in this study included pozzolanic strength activity index, water sorptivity, and shrinkage test. Calcined clay produced from clay was used as pozzolan to replace Portland cement at 20%. The strength activity test showed that the cement containing the calcined material attained higher strength activity indices than the control. The thermal gravimetric analysis showed that the pozzolan behaved partly as a filler material and partly as a pozzolanic material. The sorptivity results also showed that the blended mix resulted in lower sorptivity values than the control mortar. The study recommends that calcined clay and Portland cement mixtures could be used to produce durable concrete to maximize sustainability.
Heavy earthmoving operations are repetitive in nature and vulnerable to time-related restraints and uncertainties. Therefore, at the conceptual stage, scheduling these operations can take a linear form, known as linear schedule or line of balance (LOB). In such type of work, generating a preliminary line of balance for variable sequencing of activities is crucial. In this paper, an integrated expert system for determining preliminary linear schedules for heavy earthmoving operations at the conceptual stage is presented. The proposed system incorporates numerous factors that influence the analysis of earthmoving operations, which include geological and topographical parameters used to determine productivity rates at the conceptual stage. Also, the proposed system is capable of automatically generating a line of balance based on a stochastic scheduling technique via the metaheuristic simulated annealing intelligent approach to incorporate randomness and uncertainties in performing the associated activities. A parametric analysis is conducted in order to quantify the system’s degree of accuracy. An actual case project is then utilized to illustrate its numerical capabilities. Generating accurate linear schedules for heavy earthmoving operations at the conceptual design stage is anticipated to be of major significance to infrastructure project stakeholders, engineers, and construction managers by detecting schedule’s conflicts early in order to enhance overall operational logistics.
A recent trend in the development of off-highway construction equipment, such as excavators, is to use a system model for model-based system design in a virtual environment. Also, control system design for advanced excavation systems, such as automatic excavators and hybrid excavators, requires system models in order to design and simulate the control systems. Therefore, modeling of an excavator is an important first step toward the development of advanced excavators. This paper reviews results of recent studies on the modeling of mechanical and hydraulic subsystems for the simulation, design, and control development of excavator systems. Kinematic and dynamic modeling efforts are reviewed first. Then, various approaches in the hydraulic system modeling are presented.
Construction projects are risky in both physical implementation and management. The characteristics of the risk reinforce the necessity of efficient management to increase the chances of success without commitment to its goals. This study explores the correlation of delay and the schedule performance index (SPI) to evaluate the risk of a construction project completed with time overruns. The hypothesis that the SPI of projects with a delay is distinct from those projects without a delay is assumed. A database with 19 elements was used to test this hypothesis and to calculate limit values to the SPI. Therefore, the risk of delay will be small when the observed SPI is greater than the superior limit and large when the SPI is below the inferior limit. The simplicity involved in the calculation of these values showed an advantage in comparison with other methods of risk evaluation. Another strong point observed is that any company can determine the value of risk by considering its own history and support decisions like doing corrective actions.
The government of Indonesia had provided the Rehabilitation and Reconstruction (RR) assistance to 194,636 houses for communities after September 30, 2009, earthquake in West Sumatra. The community-based development model was adopted in this housing program aid. This study aims to explore people’s satisfaction towards the RR program and to identify the difference of satisfaction level between urban area and rural area. The research was carried out by conducting a questionnaire survey to 200 communities. The beneficiaries were invited to determine their satisfaction level based on 5 Likert scale from 1 as “not satisfied at all” to 5 as “absolutely satisfied.” The satisfaction level was assessed by two factors, process of reconstruction and result of reconstruction. It was found that the level of communities’ satisfaction is at average level. The satisfaction level of urban communities is 2.75, while the satisfaction level of rural communities is slightly higher at 2.88. The satisfaction levels of urban and rural communities with the reconstruction process are at 2.63 and 2.75, respectively, while the satisfaction level with the results of the program is at 2.84 and at 2.95, respectively. Communities’ satisfaction with the result of reconstruction is higher than that with the process of reconstruction.
Concrete workability, quantified by concrete slump, is an important property of a concrete mixture. Concrete slump is generally known to affect the consistency, flowability, pumpability, compactibility, and harshness of a concrete mix. Hence, an accurate prediction of this property is a practical need of construction engineers. This research proposes a machine learning model for predicting concrete slump based on the Least Squares Support Vector Regression (LS-SVR). LS-SVR is employed to model the nonlinear mapping between the mix components and slump values. Since the learning process of the LS-SVR necessitates two hyperparameters, the regularization and the kernel parameters, the grid search method is employed search for the most desirable set of hyperparameters. Furthermore, to construct the hybrid model, this research collected a dataset including actual concrete slump tests from a hydroelectric dam construction project in Vietnam. Experimental results show that the proposed model is capable of predicting concrete slump accurately.
The construction industry in Ghana is becoming efficient in the area of cost and achieving advance technologies. The effective management of cost enables clients, developers, and facilitators to achieve value for money. Concrete is a major component in every construction project. The use of precast concrete technology has been embraced by the construction industry in Ghana. This study seeks to analyze cost estimating of the structural frame (column and slab) by considering cast-in-place and precast concrete slabs and columns, respectively. Relative importance and Kendall’s concordance agreement were used to determine the rankings and agreement of advantages of using precast concrete. The study established that precast concrete slabs were on average 23.22% cheaper than the cast-in-place concrete elements and precast columns were averagely 21.4% less than cast-in-place concrete columns. The study established that professionals prefer the use of precast concrete products because of the life cycle cost.
While project management success focuses upon the processes and the successful accomplishments of cost and time objectives, product success deals with the quality of the final product. Recently, quality of the constructed highway has been considered highly important reason for the pavement response and its design life. The main objective of this paper is to improve the management of highway projects in Egypt by determining the most important factors influencing the quality performance of this industry. In total, 39 factors that may influence the quality of highway projects have been defined through a detailed literature review. The factors are tabulated in a questionnaire form, which is sent out to 13 owners of divided highways, 27 owners of regional roads, and 15 consultants. The analysis of the respondents’ perspectives using fuzzy triangle approach shows that the most important factors affecting the quality are availability of experienced staff in the owner’s and contractor’s teams during the project execution; efficiency of the owner’s inspection team; clarity of responsibilities and roles for each owner, consultant, and contractor; pavement which is not designed according to the regional conditions (e.g., soil type, temperature, and traffic volume); and asphalt quality and type used in the construction process.
Renovation of an existing building is an accomplished stem of the construction industry because it supplies financial diversification for construction stakeholders. Although several construction planning tools and stakeholder alignment exercises have been developed, no tool exists to assist project owners to decide between renovating an existing building and new construction with a comprehensive decision criteria. The objective of this research is to create and test a renovation versus new building support decision tool for construction project stakeholders. The renovation versus new building support decision tool was created based on an extensive review of existing support tools and construction industry needs. The created tool was implemented to evaluate decisions of educational facilities by university officials experienced in project management. Results show the tool was effective in identifying relevant topics for discussion and guiding a group of stakeholders through an exercise in decision-making. Specifically, the tool was implemented by construction management personnel for university facilities currently under construction to evaluate the decision to renovate an existing building or new construction. The main contribution of this research is a framework and support decision tool readily implementable for construction project stakeholders desiring to determine if renovation or new construction is the optimal path for their specific objectives.
Cost estimation is particularly difficult, often leading to considerable deviations. For capital projects, especially transport infrastructure projects, deviations hover around an average of 28% of the estimated cost. There are several factors that cause these deviations between the final accounts and the contract sum. How these factors combine to cause deviations between the contract sum and the final account in recent times has been of great concern to construction managers and researchers alike. This study sought to identify the significant factors that result in deviations between contract sums and the final accounts of capital projects. Using a sample size of 45, comprising contractors, consultants, and clients, the factors identified using Relative Important Indices were “price fluctuations,” “late material delivery,” “changes in the scope of work,” “fluctuations in the market demand,” and “changes in design.” Using Kendall’s coefficient of concordance, a coefficient p value of 0.068 was obtained. As such, the null hypothesis was rejected as there was a level of agreement among the respondents. Again, based on a significance test run, 26 out of the 40 identified factors used for the analysis were seen to be significant in influencing the deviations between contract sums and final accounts figures.
Many techniques have been implemented to make construction industry more productive. The key focus is on reduction of total duration, reduction in construction cost, improvements in the quality, achieving more sustainable development, and safer construction sites. One of the techniques, which is emerging in the last two decades, is the use of off-site manufacturing (OSM) within the construction industry. Several research projects and industry initiatives have reported the benefits and challenges of implementation of OSM. The focus of this paper is Australian and Chinese residential construction industry and the uptake of the OSM concepts. The paper presents a brief review of the current state of OSM in the last five to seven years with the context of the above-mentioned two countries. The paper concludes that the construction industry, both in Australia and China, needs to start walking the talk with regard to OSM adoption. The paper also highlights some of the research gaps in the OSM area, especially within the housing and residential sector.
Fuzzy logic applied to the visual inspection of existing buildings has been proposed in relation to simple structures. Isostatic structures are characterized by a unique and known collapse mechanism, which does not vary with geometry or load change. In this paper we apply fuzzy logic to visual inspection for complex structures such as hyperstatic ones in which the collapse mechanism depends not only on the geometry but also on the size and disposition of loads. The goal of this paper is to give relevant weight, in the fuzzy analysis, not only to the single expression of degradation, due to its localization within the element, but also to the structural element itself by assigning a different resistance to the various elements. The underlying aim of the proposed method is to manage, evaluate, and process all the information coming from visual inspections in order to realize a management information system for the evaluation of the safety level of even complex structures.
Delays have been frequently reported as the cause of several conflicts that affect the different parties involved in construction projects. Project Time Management (PTM) includes a number of planning and controlling processes that are recommended for complying with requirements related to project time. The study reported in this paper aimed at assessing the use of PTM processes and its relation with project schedule performance (i.e., timely completion). Seven PTM processes and seventy-seven tasks associated with them were identified from the literature that is globally relevant to project management. The study included the assessment of fourteen school construction projects executed by a public agency in the Yucatan Peninsula, Mexico. These projects were monitored during the construction phase in order to measure two different variables: the use of processes related to PTM (i.e., schedule planning and controlling processes) and the project schedule performance. For each of these projects a Use Index was obtained for assessing the first variable, while the Schedule Performance Index and the Schedule Variance were computed to assess the second one. The results demonstrated there is statistical dependence between these two variables. Most of the projects that attained timely completion also made a greater use of the PTM processes.
Construction projects play an important role in infrastructure projects in developing countries. According to type, size, and complexity of the project, the number and importance of each risk could be different and many projects cannot reach the project goals due to exposure to multiple risks. Many papers have been published on the subject of risk management in construction projects; unfortunately most of them have not been implemented in practical conditions. The aim of this study is to identify and prioritize risks in construction projects. The classical approach used probability and impact for risk assessment, but these criteria do not sufficiently address all aspects of projects risks and there might be a relationship between different criteria. This study proposes the hierarchical dependencies between criteria. A case study of construction project is presented to illustrate performance and usage of the proposed model. Utilizing library studies and interview with experts, managers, and specialists, decision criteria were identified through brain storming. Risks were categorized by the experts into eleven risks. Important risks were evaluated based on the fuzzy ANP, fuzzy DEMATEL, and fuzzy TOPSIS methods. The proposed model is more suitable than the traditional decision-making methods in prioritizing risk concerning cost, time, and quality.
Transport forms one of the primary needs in all categories of the population in modern society; it is of paramount concern for traffic engineers, transport planners, and policy makers to understand and evaluate the quality of service being provided by the transport facilities designed by them. This paper presents an investigation in profile geometric design and traffic flow operation on two-lane two-way highways and provides analyses that will help in a better understanding of traffic operation on these facilities to select the optimum profile configuration. The effects of influencing parameters consisting of grade, length of grade, traffic composition, and traffic volume are evaluated and finally a systematic procedure to evaluate flow rate under the base condition is presented. Finally, based on these achievements an algorithm is introduced to select optimum Finished Ground of profile view. Results show that the percentage of heavy vehicles has a contributing effect on traffic operation so that the optimum profile configuration is incredibly affected by this factor. Source data have been obtained from Highway Capacity Manual (HCM) as a pioneer document in respect of quantifying the concept of capacity for a transport facility.