
The business expense and value chain of virtual agency construction enterprise and owner are analyzed by using the theory of business expense and value chain on the basis of economics and strategics,in order to improve the feasibility and inevitability of formation of virtual agency construction enterprise in theory.
These factors such as politic,economic,business affair,construction environment,society influence contract to build a international project.How to analyse and evaluate These factors is very important for contractors enter into international market.The paper utilizes AHP for analysing and evaluating these factors,calculating the possibility of these factors taking place.It furnish the basis for contractor's decision.
Since 1980s,housing mortgage loan securitization(MBS) had a considerable development in our country,In order to carry on the reasonable fixed price to the housing mortgage loan securitization product,this article introduces the CAPM model to determine the discount rate which can reflect negotiable securities risk correctly,and has analyzed the CAPM model production as well as the developing process,finally carries on the dynamic revision to it.
Construction industry plays an important role in economy.It is critical to analyze the contribution rate of technique progress to economy,which can steer construction industry to the path of health growth.The theory of production leading foreland is used as academic foundation.The paper combines parameter estimate with non-parameter estimate and further calculates the contribution rate of technique progress from 2000 to 2001 by data related to construction industry in 20 provinces or cities.Results of calculations indicate that the contribution rate of technique progress is lowest and that the fluctuation of the rate is periodical.
This article introduced the present project investment design stage design mentality and the design to the project investment influence,Omni-directional analyzed in the project investment not to be able to realize the reason which the design optimized,Proposed further optimizes the design,saves the investment several practical feasible suggestions.
By segmentation of office building market,combines with the result of contrast of supply and demand、analysis of policy、development of urban economy、the item、developer and so on,in order to regard a segmentation market as target market.Through the conclusion of three possible conditions of target market,correspond the strategy to the reasons of conditions.
According to the different part of the basement and different air temperature during the construction,simplex heat preservation material was adopted and different construction methods were confirmed through calculating.The feasibility of this measure was proved by practical application.
This article taking the project manager department of railway construction enterprise as the studied object,beginning with the analyses of problems in effect evaluation of project manager department.The article infers that,to establish effect evaluation index system,basic situations of project manager department should be analyzed firstly.Then the steps of establishing effect evaluation index system is given,and effect evaluation index system based on financial and non-financial index is established,which may provide certain references for bettering the effect evaluation of project manager department.
This text introduced the characteristics to make use of a computer to loft,and take actual engineering as an example to analyze the application in the steel structure engineering in detail.
At the basis of analysis on influencing factors of collapsibility of loessal foundation,it is subjected that the collapsibile deformation should be thought of as a system that many factors worked and influenced together,especially a grey system..Thus the grey incidence analysis method can be applied to collapsibility of loessal foundation.and it is cheerful that the method works so well that some useful results could be attained according to the grey incidence analysis on influencing factors of collapsibility of loessal foundation,results indicat that the void ratio is the superior and steadily influencing factor of collapsibility at all events and other influencing factors will have some different degree of influence.The paper expounds some influencing factors of collapsibility and helps to think correctly some influencing factors in setting up the model of collapsibility.
According to characteristics of' Soil Mechanics and Foundation' Course,some experiences have been introduced for improving teaching effect and quality of the course.
Interface questions have given rise to many disputes and are very difficult resolved in constructions for their blurred boundaries.Contracts interface management is one of focal and difficult points in projects management.This paper analyze many influent factors,put forward the essentials of contracts interface management and the technological process of interface risk management.It perhaps provide a reference for proprietor to carry out contracts interface management in many project surroundings.
Using an institute gymnisum project as an example,this paper describes the construction process of using big diameter(Φ400) BDF thin-walled tubes for cast-in-place hollow floor,heightened the description of its construction methods,technology process,and relevant quality guaranty method during construction.
The brief analysis to the engineering design process and its function has made;elaborated the existing questions in the tradition engineering design process;finally unified stakeholder theory to propose Stakeholders-oriented engineering design process,also the issues and principles should be paid attention in the design process are Introduced.
PFI模式是私人主动融资模式,其越来越多的被应用在大型工程项目上.英国和日本以及亚洲很多国家都在对PFI模式进行深入的研究.本文主要从PFI合同的发展现状、PFI合同的主体及其关系、PFI合同结构及其特点进行研究.此研究将有助于PFI合同在我国的成功应用和推广.
The article introduces the bargain model and the game theory of incomplete information to the disposal of construction claim.Using the method,it analyses the common process of the claim.And the end,the article brings forward the principle on how to deal with the claim in different distances.
Recent years,with the quick development of advanced education in our country,many universities have applied for more land to enlarge their area of campus.The layout and construction of new campus and the maintenance and rebuild of old campus have made the constructive scale and investment increasing all the time,the amount of constructive investment of many universities sometimes come to many hundreds of millions or even billions.Meanwhile,the requirement for managing and controlling the constructive investment by university is improving. According to the author's many years' practical experience working at project audit,this paper researches the possible problems of university project construction-management and the solution from the perspective of audit,pointing to the character of university project construction-management.
The paper investigates the Non-price Bottom bidding in the building project by the model of game theory;analyzes the bidding strategies and the expectative revenues of the participants;deducts the characters and equilibrium of this game.At the last,by demonstration the paper discusses the necessary condition of the Non-price Bottom bidding when implemented and designs the practical mechanism of this kind of bidding,providing supportive information for the building industries and administrative managements when making decisions.
Now besieging bidding becomes common increasingly,so the measures to restrict besieging bidding activities haven been taken into the owner's account. Recently the Price-fixing Bidding,as a new arisen bidding way to restrict besieging bidding activities and to protect the profits of owners and nation,is attracting the attention from several owners and local governments.This paper analyzes the Price-fixing Bidding's influence on besieging bidding based on game theory and economic analytical methods.Then it is proved that the Price-fixing Bidding can restrict besieging bidding activities efficiently.
The importance of project management has been being recognized,which now has become one of the hot topics of the study of this discipline at home and abroad;and in which project management office and project culture occupy a great position,yet few people,thus far,have located sufficient attention on them,even fewer explored the two together.Based on the reality,this paper will analyze the relations between them and provide corresponding suggestions and strategies on the precondition that the two be explored separately.