• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
      MCP&Skill
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    Dam Observation and Geotechnical Tests

    Dam Observation and Geotechnical Tests

    Journal

    年发文量

    研究主题

    论文(2984)

    排序
    1Simulation Feedback of Temperature Field of Super-High Arch Dam During Operation and Its Difference with Design Temperature
    Chunyao Hou, Dong Chai,Heng Cheng, Shaoqing Ning,Bo Yang, Yi Zhou

    Temperature is one of the main loads of super-high arch dams. (1) Background: a super-high arch dam in southwest China was taken as an example in this paper and the temporal-spatial evolution law of dam temperature was analyzed based on the monitoring data. (2) Methods: the finite element simulation analysis method was adopted to invert the boundary conditions of temperature on the upstream surface and the thermal parameters of the concrete, and the temperature evolution process of the arch dam in long-term operation was simulated and analyzed. After the distribution characteristics of the designed reservoir water temperature and the actual reservoir water temperature were compared, the difference in the temperature field of the arch dam during the impoundment and operation under the designed and actual conditions was studied. (3) Results: the temporal-spatial evolution law of the temperature in the dam operation period accords with the conventional knowledge, and the calculated value through simulation feedback is in good agreement with the monitoring value, which can reflect the actual temperature field distribution of the dam. (4) Conclusions: under the design condition, the dam temperature rose slowly after closure grouting and then tended to be stable. Under the actual condition, the temperature rose by 7.1~9.2 °C after closure grouting, reached the highest temperature in about 8~12 years, and fell back to a stable temperature in 40~80 years.

    2023引用:4
    引用
    AI阅读
    加入学术空间
    2Test Analysis of Back-to-Back Start-up Failure of Units in Yixing Pumped Storage Power Station
    CHEN Hehu,HU Jing,LIANG Qingchun,ZHANG Bingbing,YAO Yangyang

    The back-to-back startup mode is the only backup method for pumping and phase modulation startup of Pumped Storage Power Station unit. Since Yixing pumped storage Power Station was put into operation,there have been problems such as timeout and out-of-step during the back-to-back start-up process of the unit. related with results of low start-up success rate.Focused on back-to-back start-up failure of the start-up,this paper designs a completed test plan regarding field test,at same time,based on the data analysis and main cause diagnosis,the cause of the startup failure was discovered,and the diagnosis conclusion is further verified by the optimized test that the success rate of back-toback startup could be improved efficiently by optimizing guide vane opening method of Generator and excitation current of Generator/pump.

    2023
    引用
    AI阅读
    加入学术空间
    3抽水蓄能机组安全稳定运行与控制研究

    近年来,我国以水电、风电、光伏发电为代表的可再生能源实现跨越式发展,装机规模稳居全球首位,发电量占比稳步提升,能源结构调整和减碳效果逐步显现.截至2022年底,我国水电并网装机容量4.135亿kW,风电3.654亿kW,太阳能发电3.926亿kW,占全国发电总装机的45.7%,已达到相对多数地位.

    2023
    引用
    AI阅读
    加入学术空间
    4Research on Economic Operation of Cascade Hydropower Stations in Kashi River
    ZHUO Siming,SUN Yonghong,LI Shuming

    针对喀什河流域梯级电站经济调度运行问题,提出了混合式梯级电站站间负荷实时分配策略,针对各种策略提出了多模型自动适配方法和详细的求解流程.通过平行仿真计算并与实际系统进行对比,结果表明,所采用的经济调度方法在满足各项安全约束的前提下,可实现梯级五级站总负荷的站间实时分配,在保持水位更趋平稳的同时,降低了耗水率,提高了蓄能量,为提高梯级发电效益和灌溉效益提供了技术支持,对同类型梯级水电站的经济运行具有普遍的参考意义.

    2023
    引用
    AI阅读
    加入学术空间
    5Optimization Method for State Monitoring of Pumped Storage Units Based on Vibration Characteristic Curve
    ZHAO Weiqiang, YAN Dandan,XU Beibei, WANG Zhengwei

    为早日实现"双碳"目标,以风能和太阳能为代表的新型可再生能源近年来成为能源增长的主力军.为应对新型可再生能源带来的间歇性供电和用电端的需求波动,抽水蓄能正在发挥越来越重要的作用,同时水泵水轮机需要更多地在远离设计点的扩展运行范围内运行,这带来了更多的转轮疲劳破坏等故障现象.针对这种运行方式,建立有效的状态参数趋势分析非常重要. 本文针对水泵水轮机的振动特点进行详细分析,提出了一系列表征机组振动特征的性能指标,进而提出类似混流式水轮机综合特性曲线的水泵水轮机机组振动特性曲线.通过对水泵水轮机机组振动特性曲线的趋势分析,可以更准确地评估指标及其趋势以及异常值的识别.本方法被用于某大型水泵水轮机的两年运行的监测.首先,针对机组振动特征,从振动监测数据提取相关特征参数,使用人工神经网络(ANN)对特征参数进行拟合,获得水泵水轮机机组振动特性等值线图.将水泵水轮机机组振动特性曲线同国际标准建议的警报和停机值进行对比,量化评估不同方法对机组状态监测的准确性.最后,针对不同状态监测指标的趋势分析,提出了水泵水轮机状态监测雷达图.结果表明使用动态状态监测指标代替常数值设置动作水平,受试者工作特征(ROC 曲线)将得到改善,证明动态状态监测指标可以对水泵水轮机实现更好的诊断能力.

    2023
    引用
    AI阅读
    加入学术空间
    立即登录,查看全部 2984 篇论文

    高被引作者

    作者引用发文
    Yi Chen1409
    Lei Gao1399
    Yadong Mei1299
    YongHong Li12915
    ShengQiang Hua12712
    Jun Wang1268
    GuanBiao Liu1229
    Yonggang Wu1197
    Zhaohui Li11622
    DeKuan Wang11110

    高产作者

    作者引用发文
    Chongshi Gu10124
    Zhaohui Li11622
    HongYu Chen8821
    JianFeng Chai2417
    Shouping Wei10716
    Chong Shi9915
    Lin Gui4515
    YongHong Li12915
    Zhongru Wu10614
    Weifeng Pan7214

    相关期刊

    Jiangxi Electric Power
    Electric Power Survey & Design
    Electric Age
    China Power Enterprise Management
    Electric Safety Technology
    Shanxi Electric Power
    Guangxi Electric Power
    Popular Utilization of Electricity
    Electrical Equipment and Economy
    Electrical World