• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
      MCP&Skill
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    Journal of Modern Project Management

    Journal of Modern Project Management

    JournalISSN 2317-3963

    年发文量

    研究主题

    论文(201)

    排序
    1Skills and Project Managers: Relationship Between Personal Characteristics and Performance Indicators
    Fernando Ribeiro Serra,Isabel Cristina Scafuto,Leonardo Vils, Marcio Saraiva Mattos

    The project management (PM) has gained relevance in organizations for being considered a tool that increases the efficiency of the projects, allowing a better control of costs, schedule and quality of projects managed under the methodology. The traditional definition of success in PM is based on the triple constraint (cost/timeline/scope), for every type of project executed. In contrast to this approach arises the adaptive approach suggested by authors who advocate that each project must be measured and managed in a different way. Within this approach include the view that the project manager must assume the role of a team leader, and that human and relational issues are relevant to the performance of the project. This work consists of an explanatory and quantitative research that relates critical success of success with leadership skills. To define the capacities to be studied, four leadership theories served as the basis for the study. The results demonstrate that the leadership skills of the project manager impact significantly some critical factors of success, while others were not impacted. The comprehension about how the leadership skills of the project manager impact the critical factors of success of the project, can both bring greater effectiveness in the recruitment process, development and direction of project managers career, as well as assisting organizations and managers who use techniques and tools of project management to better assess and define critical factor of success of the projects. To the project managers, this work can assist in the understanding of how to mobilize their leadership skills in a more results and superior performance in their projects.

    2021引用:1
    引用
    AI阅读
    加入学术空间
    2Project Resource Optimization Considering Labor Productivity Factors
    Kamal Jaafar, Roman Shaylo

    Labor cost takes a central place during the operation of a company's activities due to its high monetary value and importance on its production. This is one of the priority questions on how to minimize labor costs and improve efficiency of workers. Timeframe, quality and works delivery on time are the most significant factors for project development. It is highly dependable on the efficiency of resources, factors related to its performance. When it comes to actual work and execution on site, work which executed by less qualified technicians or managers with irrelevant or not sufficient enough knowledge and experience may result in a low quality of work, mistakes which may need to be recovered on a later stages creating delays in a project schedule, additional cost, resources, project failure. This research we will be emphasizing on optimization of activities related to a construction field and on how to measure, execute, allocate available or proposed resources to a specific task to achieve a required level of performance.

    2021
    引用
    AI阅读
    加入学术空间
    3Project Recovery : Project Failures and How to Get Rid of Them
    Marie-Julie De Bruyne, Eva Moens,Mario Vanhoucke

    Since the 1960s, project success has been receiving much interest from both academics and practitioners. Despite these efforts, project failure is still a recurring and prevalent phenomenon. In both peer-reviewed and non-peer-reviewed project management literature, a great deal of studies generates lists of success factors and failure causes. Few studies, however, investigate concrete recovery strategies to bring failing projects back on track. The present article, therefore, draws upon the literature on critical success factors and project recovery frameworks to construct an eight-step action plan that helps in recovering from project failure. The recovery action plan was awarded the University Contest by PMI Belgium in 2019.

    2021引用:1
    引用
    AI阅读
    加入学术空间
    4Fear of Flying
    Kathleen Neal Cleaver, Joy James

    Fear of flying has no direct relationship with actual airline or aircraft safety. For those afraid of flying, the choice of an airline ticket and the related airplane is expected to be an important issue. This article uses a methodology to simulate the experience of purchasing unlabeled airline tickets to investigate whether individuals who are afraid of flying unconsciously change their choice depending on the ticket parameters. The Boeing 737 MAX, which became notorious for being grounded due to two recent accidents, was randomly assigned to airline tickets. This aircraft was compared with eight competing alternatives. The results demonstrate that in the event of a return to service, the passenger preference for this aircraft would be low comparable to that for competing modern airplanes that are less known to the North American public. Nonetheless, Boeing products continue to instill a sense of safety and trust in those afraid of flying.

    2021
    引用
    AI阅读
    加入学术空间
    5Service Based Framework of Research Projects in Higher Education Institutions
    Mariam Al Ali Al‐Maadeed, Shahbaz Hussain,Mohammed Al-Salem,Abdelaziz Bouras

    This work presents and disseminates the services and infrastructure required to manage research projects quantity and quality in higher education institutions. To achieve this objective, smart management of research offices, their processes and collaborative projects are of paramount importance in order to understand the underlying activities for effective decision making. This approach has been developed in depth considering the lifecycle of grants in a research office. The processes of a research office, its automation, importance of collaborative projects with academia and industry around the globe and their impact on research output have been developed first and then applied on a public higher education institution. The developed framework with its implementation example can be adopted by various research based organizations to efficiently manage and strengthen their research outlook.

    2021引用:5
    引用
    AI阅读
    加入学术空间
    立即登录,查看全部 201 篇论文

    高被引作者

    作者引用发文
    Mario Vanhoucke977
    A.J. Gilbert Silvius926
    R.P.J. Schipper854
    Jose Silva Coelho531
    Jordy Batselier531
    Hélio R. Costa271
    Ana Regina Rocha271
    Márcio De Oliveira Barros271
    Joao Varajao262
    Bjorn Andersen252

    高产作者

    作者引用发文
    Darli Rodrigues Vieira1518
    Jonathan Whitty117
    Mario Vanhoucke977
    Stephen Keith McGrath106
    A.J. Gilbert Silvius926
    Marly Monteiro de Carvalho96
    Shahadat Uddin194
    Christophe Leyrie104
    Chivonne Algeo124
    R.P.J. Schipper854

    相关期刊

    International journal of information systems and change management
    Project Management Journal
    International Journal of Project Organisation and Management
    International Journal of Construction Supply Chain Management
    International Journal of Managing Projects in Business
    International Journal of Business Administration
    Future Studies Research Journal: Trends and Strategies
    International journal of innovation, management and technology
    The Journal of Modern Project Management
    WPOM-WORKING PAPERS on OPERATIonS MANAGEMENT