The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce ‘Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore ‘Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce ‘Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.
: Due to the significant size of overseas construction projects, the cost overrun has enormous impacts on the financial status of construction companies. The managers’ appropriate perception and identification of key risk factors in the construction phase notably affect the performance of projects. However, the actual impacts of risk factors and local manager’ s perception of them could be deviated. For this reason, we aim to compare the performance of actual cases and general opinions of responsible practitioners in terms of risk factors relevant to cost overruns in order to present a practical strategy for risk management. Firstly, factors classified from literature review were used to simulate 290 cost overruns data sets from 20 cases by introducing Monte-Carlo Simulation and were ranked by standardized coefficients through multiple regression analysis. Secondly, a survey was conducted against 42 local managers to rank their perception of impact on cost overrun with identical factors by using Stepwise Weight Assessment Ratio Analysis (SWARA). Comparison results show that conflicts such as ‘conflict with subcontractors’ and ‘conflict with the local community’ have caused excessive cost overrun. However, managers' perception of these as less significant than the actual influences and consider other risks such as ‘material price fluctuation’ and ‘construction quality errors’, as relatively serious. Therefore, education for local managers on conflict risks needs to be presented.