LLNL completed the FY20 workplan entailing application of the Dynamic Correlation Processor (DCP) to International Monitoring System (IMS) primary seismic data in 2019 and 2020. The effective analysis period was curtailed to January 1 through November 12, 2019 due to a data compression change that rendered later data unusable. Fixing the data compression error is a priority for our data source, and we plan to extend the period of data analysis when the fix is implemented. We found that the percentage overlap between detections generated by the International Data Centre (IDC) DFX software and detections generated by DCP varied widely by station. Overlap is 30-40% at some stations, suggesting that a large percentage of DFX detections could be screened (removed) from the detection-event association algorithm. However, detection overlap was much lower, a few percent, at many stations and the percentage overlap was low at stations known to have many mines and other local sources of seismicity. Unexpectedly low detection overlap at many stations prompted us to examine results for the ARCES station in detail. There is considerable mine activity near ARCES, but our initial FY20 analysis found only ~2% DCP/DFX detection overlap. Differences in the pre-processing (e.g. beam recipes) used by DCP and DFX appear to be the cause of low detection overlap at ARCES. DCP uses wideband filters to improve detector robustness and the IDC uses narrow-band pre-filtering to improve sensitivity. After reprocessing ARCES using the IDC beam recipe, DCP/DFX overlap increased to ~74%. This result shows that we must reprocess the IMS network using the IDC station-specific beam recipes if we are to effectively screen DFX detections and improve automatic event building performance at the IDC.