• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    专

    一种稳定的螺内酯药物纳米粒组合物

    126222589997A
    发明人
    吴涛
    受让人
    BEIJING HUICHENG RUIXIANG PHARM BIOTECHN (BEIJ-Non-standard), BEIJING HUICHENG YIJIAN PHARM TECHNOLOGY (BEIJ-Non-standard)
    申请人
    JEAN FLEURY BRUYERE
    申请号
    047436
    申请日
    2022-10-16
    公开(公告)号
    126222589997A
    公开(公告)日
    2007-03-05
    IPC分类号
    B23Q007/04B27F001/00B27F000/00
    CPC分类号
    -
    优先权号
    083469
    优先权日
    1989-08-30
    摘要

    NOVELTY - The structure has a metal body (10) provided with a jig shape. A surface modification layer (15) is formed on a surface portion of the metal body. An adhesive layer (20) is arranged on the surface modification layer. A low-reflection anti-static layer (30) is placed on the adhesive layer. Thickness of 5 to 500 nm is formed in a high-temperature plasma-treated region. The adhesive layer includes metal and an alloy. The low-reflective antistatic layer is made of oxide, nitride and oxynitride, where thickness of the low reflection anti-static layer ranges from 0.8 to 1.5 micrometer.

    USE - Jig structure for semiconductor packaging process.

    ADVANTAGE - The static electricity generation during the semiconductor packaging process is effectively prevented. The recognition errors due to light reflection are prevented, and the durability and wear resistance of the jig structure are improved.

    DETAILED DESCRIPTION - An INDEPENDENT CLAIM is also included for a jig structure manufacturing method.

    DESCRIPTION OF DRAWING(S) - The drawing shows a schematic representation of the jig structure.

    10Metal body

    15Surface modification layer

    20Adhesive layer

    30Low-reflection anti-static layer

    权利要求
    1 . A method comprising: via a computer network, receiving identification of a first advertisement slot loaded within a first webpage accessed at a computing device by a user; receiving a first set of advertisement slot characteristics corresponding to the first advertisement slot, the first set of advertisement slot characteristics comprising a first address of the first webpage; accessing a first set of webpage data, stored in a webpage container, corresponding to the first webpage based on the first address; accessing a catalog of advertisements assigned to a set of webpages comprising the first webpage, each advertisement in the catalog of advertisements defining a target outcome representative of a set of target interactions for users interacting with the advertisement; accessing a model associating advertisement slot characteristics and webpage data to a set of target outcomes of advertisements in the catalog of advertisements; for each target outcome, in the set of target outcomes: calculating an outcome score for the first advertisement slot based on the first set of advertisement slot characteristics, the first set of webpage data, and the model, the outcome score representing a probability of the user interacting with advertising content, presented within the first advertisement slot, according to the target outcome; and storing the outcome score in a first set of outcome scores, associated with the set of target outcomes, for the first advertisement slot; and in response to a first outcome score, in the first set of outcome scores, exceeding each other outcome score in the first set of outcome scores: assigning a first target outcome, in the set of target outcomes, corresponding to the first outcome score, to the first advertisement slot; and selecting a first advertisement, in the catalog of advertisements, designating the first target outcome, for presentation within the first advertisement slot.
    2 . The method of claim 1 , further comprising, over a first period of time: serving advertising content in advertisement slots inserted into the set of webpages accessed by a population of computing devices associated with a population of users; receiving a corpus of advertisement slot characteristics associated with advertisement slots inserted into the set of webpages and accessed by the set of computing devices; receiving a corpus of engagement data representing interactions of the population of users with advertising content presented within advertisement slots accessed by the set of computing devices; and generating a model linking advertisement slot characteristics to target outcomes of advertising content based on the corpus of engagement data and the corpus of advertisement slot characteristics.
    3 . The method of claim 1 : wherein receiving identification of the first advertisement slot loaded within the first webpage accessed at the computing device comprises receiving identification of the first advertisement slot loaded within the first webpage accessed at the computing device at a first time; wherein receiving the first set of advertisement slot characteristics comprising the first address of the first webpage comprises receiving the first set of advertisement slot characteristics comprising the first address of the first webpage, a first location of the first advertisement slot within the first webpage, and a first set of device characteristics corresponding to the computing device, the first set of device characteristics comprising: a first device type of the computing device; a first geographic location of the computing device; and a timestamp corresponding to the first time.
    4 . The method of claim 1 : wherein calculating the outcome score for the first advertisement slot for each target outcome, in the set of target outcomes comprises calculating the first outcome score for the first target outcome comprising video completion rate, the first outcome score representative of a probability of the user viewing a minimum proportion of a duration of video advertising content, presented within the first advertisement slot; wherein inserting the outcome score into the first set of outcome scores, for each target outcome in the set of target outcomes comprises inserting the first outcome score into the first set of outcome scores; wherein assigning the first target outcome to the first advertisement slot in response to the first target outcome score exceeding each other outcome score in the first set of outcome scores comprises assigning the first target outcome comprising video completion rate to the first advertisement slot in response to the first outcome score, corresponding to video completion rate, exceeding each other outcome score in the first set of outcome scores; and wherein selecting the first advertisement designating the first target outcome comprises selecting the first advertisement designating video completion rate.
    5 . The method of claim 1 : wherein calculating the outcome score for the first advertisement slot for each target outcome, in the set of target outcomes, comprises: calculating the first outcome score for the first target outcome comprising viewability; and calculating a second outcome score for a second target outcome comprising brand lift; and wherein assigning the first target outcome to the first advertisement slot in response to the first outcome score exceeding each other outcome score, in the first set of outcome scores, comprises assigning viewability to the first advertisement slot in response to the first outcome score corresponding to viewability exceeding the second outcome score corresponding to brand lift.
    6 . The method of claim 5 : wherein selecting the first advertisement designating the first target outcome comprises selecting the first advertisement designating viewability and defining a first advertisement format responsive to scroll; and further comprising, in response to the second outcome score corresponding to brand lift exceeding the first outcome score corresponding to viewability: assigning brand lift to the first advertisement slot; and selecting a second advertisement, in the catalog of advertisements, designating brand lift and defining a second advertisement format defining a banner advertisement.
    7 . The method of claim 1 , further comprising: sorting the set of target outcomes by outcome score in a first ranked outcome list for the first advertisement slot loaded within the first webpage; writing the first ranked outcome list to a first advertisement slot container corresponding to the first advertisement slot; and storing the first advertisement slot container in the first set of webpage data, stored within the webpage container, corresponding to the first webpage.
    8 . The method of claim 7 : wherein selecting the first advertisement for presentation within the first advertisement slot further comprises serving the first advertisement to the first advertisement slot for presentation to the user within the first webpage accessed by the computing device; further comprising: in response to serving the first advertisement to the first advertisement slot, receiving a first set of engagement data representing user interactions with the first advertisement, presented within the first advertisement slot; for each target outcome, in the set of target outcomes: calculating an actual outcome score for the first advertisement slot, containing the first advertisement, based on the first set of engagement data; and inserting the actual outcome score into a first set of actual outcome scores for the first advertisement slot; and writing the first set of actual outcome scores to the first advertisement slot container corresponding to the first advertisement slot; and wherein storing the first advertisement slot container in the first set of webpage data, stored within the webpage container, comprises storing the first advertisement slot container in the first set of webpage data, stored within the webpage container, the first advertisement slot container comprising the first set of outcome scores and the first set of actual outcome scores.
    9 . The method of claim 1 : wherein assigning the first target outcome to the first advertisement slot in response to the first outcome score exceeding each other outcome score in the first set of outcome scores comprises designating the first target outcome as a primary target outcome assigned to the first advertisement slot in response to the first outcome score exceeding each other outcome score in the first set of outcome scores; further comprising, in response to assigning the first target outcome as the primary target outcome assigned to the first advertisement slot: isolating a subset of advertisements, in the catalog of advertisements, designating the first target outcome, the subset of advertisements comprising the first advertisement; and in response to a second outcome score, in the first set of outcome scores, exceeding each other outcome score in the first set of outcome scores, excluding the first outcome score, designating the second target outcome as a secondary target outcome assigned to the first advertisement slot; and wherein selecting the first advertisement, in the catalog of advertisements, designating the first target outcome, for presentation within the first advertisement slot, further comprises, selecting the first advertisement, in the first subset of advertisements, designating the first target outcome and the second target outcome, for presentation within the first advertisement slot.
    10 . The method of claim 1 : wherein selecting the first advertisement for presentation within the first advertisement slot comprises: identifying a first subset of advertisements, in the catalog of advertisements, designating the first target outcome, the first subset of advertisements comprising the first advertisement; and accessing a first set of advertisement data, stored in an advertisement container, corresponding to the first advertisement; calculating an adjusted outcome score for the first advertisement slot based on the first set of advertisement slot characteristics, the first set of webpage data, the first set of advertisement data and the model, the adjusted outcome score representative of a probability of user engagement with the first advertisement, presented within the first advertisement slot, according to the first target outcome; and in response to the adjusted outcome score exceeding a threshold outcome score, selecting the first advertisement for presentation within the first advertisement slot.
    11 . The method of claim 10 , wherein accessing the first set of advertisement data corresponding to the first advertisement comprises accessing the first set of advertisement data comprising: a format of the first advertisement; a subject of the first advertisement; and a set of engagement data representing historical user interactions with the first advertisement and comprising historical outcomes associated with presenting the first advertisement in advertisement slots and corresponding advertisement slot characteristics of advertisement slots loaded with the first advertisement.
    12 . The method of claim 1 : wherein receiving identification of the first advertisement slot loaded within the first webpage further comprises receiving identification of the first advertisement slot and a second advertisement slot loaded within the first webpage; wherein receiving the first set of advertisement slot characteristics comprises receiving the first address of the first webpage and a first location of the first advertisement slot within the first webpage; further comprising: receiving a second set of advertisement slot characteristics corresponding to the second advertisement slot, the second set of advertisement slot characteristics comprising the first address of the first webpage and a second location of the second advertisement slot within the first webpage; for each target outcome, in the set of target outcomes: calculating an outcome score for the second advertisement slot based on the second set of advertisement slot characteristics, the first set of webpage data, and the model, the outcome score representing a probability of the user interacting with advertising content, presented within the second advertisement slot, according to the target outcome; and storing the outcome score in a second set of outcome scores, associated with the set of target outcomes, for the second advertisement slot; and wherein assigning the first target outcome, corresponding to the first outcome score, to the first advertisement slot in response to the first outcome score exceeding each other outcome score, in the first set of outcome scores, comprises: in response to the first outcome score exceeding each other outcome score, in the first set of outcome scores, selecting the first target outcome for the first advertisement slot; in response to a second target outcome, in the second set of outcome scores, exceeding each other outcome score in the second set of outcome scores, selecting the second target outcome for the second advertisement slot; calculating a composite outcome score based on a combination of the first outcome score of the first advertisement slot and the second outcome score of the second advertisement slot; and in response to the composite outcome score exceeding a threshold outcome score: assigning the first target outcome to the first advertisement slot; and assigning the second target outcome to the second advertisement slot.
    13 . A method comprising: via a computer network, receiving identification of a first advertisement slot loaded within a first webpage accessed at a computing device by a user; receiving a first set of advertisement slot characteristics comprising a first address of the first webpage and a first location of the first advertisement slot within the first webpage; accessing a model associating advertisement slot characteristics and user interactions with a set of advertisements in a first advertising campaign; for a first advertisement, in the first advertising campaign: accessing a first set of advertisement characteristics stored in a first advertisement container corresponding to the first advertisement; and calculating a first outcome score for the first advertisement based on the first set of advertisement slot characteristics, the first set of advertisement characteristics, and the model, the first outcome score representing a probability of the user interacting with the first advertisement, presented within the first advertisement slot, according to a first target outcome defined by the first advertising campaign; and in response to the first outcome score exceeding a threshold outcome score, selecting the first advertisement for presentation within the first advertisement slot accessed by the computing device.
    14 . The method of claim 13 , further comprising, in response to the first outcome score falling below the threshold outcome score: withholding the first advertisement from presentation within the first advertisement slot; and selecting a second advertisement, in the first advertising campaign, for presentation within the first advertisement slot.
    15 . The method of claim 13 : further comprising, for a second advertisement, in the first advertising campaign: accessing a second set of advertisement characteristics stored in a second advertisement container corresponding to the second advertisement; and calculating a second outcome score for the second advertisement, based on the first set of advertisement slot characteristics, the second set of advertisement characteristics, and the model, the second outcome score representing a probability of the user interacting with the second advertisement, presented within the first advertisement slot, according to the first target outcome defined by the first advertising campaign; wherein selecting the first advertisement, for presentation within the first advertisement slot, in response to the first outcome score exceeding the threshold outcome score, further comprises in response to the first outcome score for the first advertisement exceeding the threshold outcome score and, in response to the first outcome score exceeding the second outcome score for the second advertisement, selecting the first advertisement for presentation within the first advertisement slot; and further comprising, in response to the second outcome score exceeding the threshold outcome score and the second outcome score exceeding the first outcome score, selecting the second advertisement, in the first advertising campaign, for presentation within the first advertisement slot.
    16 . The method of claim 15 : wherein accessing the first set of advertisement characteristics corresponding to the first advertisement comprises accessing the first set of advertisement characteristics corresponding to the first advertisement, the first set of advertisement characteristics comprising a first advertisement format comprising a digital video responsive to scroll inputs by the user; wherein accessing the second set of advertisement characteristics corresponding to the second advertisement comprises accessing the second set of advertisement characteristics corresponding to the second advertisement, the second set of advertisement characteristics comprising a second advertisement format comprising an image comprising a set of selectable regions responsive to click inputs by the user; wherein calculating the first outcome score for the first advertisement based on the first set of advertisement slot characteristics, the first set of advertisement characteristics, and the model, comprises: predicting a quantity of scrolls over the first advertisement based on the first set of advertisement slot characteristics, the first set of advertisement characteristics, and the model; accessing a target quantity of scrolls associated with a minimum brand lift; and calculating the first outcome score for the first advertisement based on the quantity of scrolls and the target quantity of scrolls; and wherein calculating the second outcome score for the second advertisement based on the first set of advertisement slot characteristics, the second set of advertisement characteristics, and the model, comprises: predicting a quantity of clicks at selectable regions, in the set of selectable regions, of the second advertisement based on the first set of advertisement slot characteristics, the second set of advertisement characteristics, and the model; accessing a target quantity of clicks associated with the minimum brand lift; and calculating the second outcome score for the second advertisement based on the quantity of clicks and the target quantity of clicks.
    17 . The method of claim 13 , further comprising: wherein receiving identification of the first advertisement slot loaded within the first webpage comprises, at a first time, receiving identification of the first advertisement slot loaded within the first webpage; wherein selecting the first advertisement for presentation within the first advertisement slot comprises, at a second time succeeding the first time, selecting the first advertisement for presentation within the first advertisement slot accessed by the computing device; and further comprising: at a third time succeeding the second time, accessing a first set of engagement data representative of user interactions with the first advertisement presented within the first advertisement slot on the first webpage; calculating an actual outcome score for the first advertisement, presented within the first advertisement slot, based on the first set of engagement data; characterizing a first difference between the first outcome score and the actual outcome score; at a fourth time succeeding the third time, via the computer network, receiving identification of a second advertisement slot loaded within a second webpage accessed at the computing device; receiving a second set of advertisement slot characteristics comprising a second address of the second webpage and a second location of the second advertisement slot within the second webpage; for a second advertisement, in the first advertising campaign: accessing a second set of advertisement characteristics stored in a second advertisement container corresponding to the second advertisement; and calculating a second outcome score for the second advertisement based on the second set of advertisement slot characteristics, the second set of advertisement characteristics, the model, and the first difference, the second outcome score representing a probability of the user interacting with the second advertisement, presented within the second advertisement slot, according to the first target outcome defined by the first advertising campaign; and in response to the second outcome score falling below the threshold outcome score, withholding the second advertisement from presentation within the second advertisement slot.
    18 . A method comprising: via a computer network, receiving identification of a first advertisement slot loaded within a first webpage accessed at a computing device by a user; receiving a first set of advertisement slot characteristics comprising a first address of the first webpage and a first device characteristic corresponding to the computing device; accessing a first set of engagement data associated with the first address of the first webpage, the first set of engagement data representative of user interactions with advertising content rendered within advertisement slots loaded within webpages accessed at the first address; for each target outcome, in a set of target outcomes: accessing an outcome model, in a set of outcome models, associating advertisement slot characteristics and user interactions with advertisements and corresponding to the target outcome; calculating an outcome score for the first advertisement slot based on the first set of advertisement slot characteristics, the first set of engagement data, and the outcome model, the outcome score representing a probability of the user interacting with advertising content, presented within the first advertisement slot, according to the target outcome; and inserting the target outcome into a first outcome index according to the outcome score; and serving the first outcome index to an advertising platform, the first outcome index comprising a set of target outcome and outcome score pairs.
    19 . The method of claim 18 : wherein accessing the outcome model associating advertisement slot characteristics and user interactions with advertisements and corresponding to the target outcome, for each target outcome in the set of target outcomes, comprises: accessing a first outcome model associating advertisement slot characteristics and user interactions with advertisements and corresponding to a first target outcome associated with video completion rate; accessing a second outcome model associating advertisement slot characteristics and user interactions with advertisements and corresponding to a second target outcome associated with viewability; wherein calculating the outcome score representing a probability of the user interacting with advertising content, presented within the first advertisement slot, according to the target outcome, for each target outcome in the set of target outcomes comprises: calculating a first outcome score representing a probability of the user interacting with advertising content, presented within the first advertisement slot, according to the first target outcome; and calculating a second outcome score representing a probability of the user interacting with advertising content, presented within the first advertisement slot, according to the second target outcome; wherein inserting the target outcome into the first outcome index according to the outcome score, for each target outcome in the set of target outcomes, comprises: initializing the first outcome index for the first advertisement slot; inserting a first target outcome and outcome score pair into the first outcome index according to the first outcome score, the first target outcome and outcome score pair comprising the first target outcome paired with the first outcome score; and inserting a second target outcome and outcome score pair into the first outcome index according to the second outcome score, the second target outcome, and outcome score pair comprising the second target outcome paired with the second outcome score; and wherein serving the first outcome index to the advertising platform, the first outcome index comprising the set of target outcome and outcome score pairs, comprises publishing the first outcome index to the advertising exchange platform, the first outcome index comprising the set of target outcome and outcome score pairs comprising the first target outcome and outcome score pair and the second target outcome and outcome score pair, sorted according to outcome score.
    20 . The method of claim 18 : wherein receiving identification of the first advertisement slot loaded within the first webpage comprises receiving identification of the first advertisement slot loaded within the first webpage from an instance of a publisher portal via an advertisement slot identification module; wherein receiving the first set of advertisement slot characteristics comprises receiving the first set of advertisement slot characteristics from the instance of the publisher portal via an advertisement slot characterization module; wherein accessing the first set of engagement data associated with the first address comprises accessing the first set of engagement data associated with the first address via an engagement data extraction module; wherein accessing the outcome model corresponding to the target outcome comprises accessing the outcome model corresponding to the target outcome via a model extraction module; wherein calculating the outcome score for the first advertisement slot comprises calculating the outcome score for the first advertisement slot via an outcome score generation module; wherein inserting the target outcome into the first outcome index comprises inserting the target outcome into the first outcome index via an outcome index generation module; and wherein publishing the first outcome index to the advertising platform comprises publishing the first outcome index to the advertising platform accessible to a set of instances of an advertiser portal.
    说明书
    [0001]Technical Field
    [0002][0001]The present invention relates to a component life prediction system and a maintenance assistance system, and particularly to a component life prediction system and a maintenance assistance system for predicting the life of a component of a work machine.
    [0003][0002]The present application claims priority from Japanese patent application JP 2021-059112 filed March 31, 2021 , the entire content of which is hereby incorporated by reference into this application.
    [0004]Background Art
    [0005][0003]Conventionally, in the relevant technical field, a supplemental component production prediction system is known in which, as described in Patent Literature 1, for example, a load applied to a component in an operating area is acquired from a server based on position information of a work machine, the life of the component is predicted for each operation area based on the operating history of the work machine, and warning information is transmitted to the work machine in which the component life has been reached.
    [0006]Citation List
    [0007]Patent Literature
    [0008][0004]Patent Literature 1: JP 2005-173979 A
    [0009]Summary of Invention
    [0010]Technical Problem
    [0011][0005]However, in the case of the supplemental component production prediction system described in Patent Literature 1, it cannot be said that highly accurate life prediction is possible simply by associating the load of the component with each operation area. Further, data concerning the load applied to the component in the operation area needs to be prepared in advance for each operation area. This creates the problem that, while the life of the component may be predicted for an area in which an operation has been performed in the past, the life cannot be predicted for a new operation area, since the data concerning the load applied to the component in that area is not available. As a result, the accuracy of prediction of the life of the component is decreased.
    [0012][0006]In view of the above, it is an object of the present invention to provide a component life prediction system and a maintenance assistance system that offers increased prediction accuracy with which the life of a component of a work machine is predicted.
    [0013]Solution to Problem
    [0014][0007]A component life prediction system according to the present invention includes a server device configured to be able to communicate with a work machine, and capable of predicting the life of a component of the work machine. The server device acquires operation information of the work machine including operation location information of the work machine, estimates an industry in which the work machine is used based on the operation information of the work machine and a pre-stored aerial photo of the operation location of the work machine, and predicts the life of the component of the work machine, based on the estimated industry.
    [0015][0008]In the component life prediction system of the present invention, the industry in which the work machine is used is estimated based on the operation information of the work machine and the pre-stored aerial photo of the operation location of the work machine, and the life of the component of the work machine is predicted based on the estimated industry. In this way, it is possible to take into consideration the operation environment and operational feature of the work machine in each industry, and to then perform the component life prediction tailored to the industry. Accordingly, increased prediction accuracy can be obtained.
    [0016]Advantageous Effects of Invention
    [0017][0009]According to the present invention, the accuracy of prediction of the life of a component of a work machine can be increased.
    [0018]Brief Description of Drawings
    [0019][0010]Fig. 1 is a schematic configuration diagram of a component life prediction system according to an embodiment. Fig. 2 is a flowchart of a control process of a server device. Fig. 3 illustrates an example of a daily operation report table. Fig. 4 illustrates an example of a component replacement history table. Fig. 5 illustrates an example of a client information table. Fig. 6 illustrates examples of operational features of a work machine in various industries. Fig. 7 illustrates an example of a message displayed on a user terminal. Fig. 8 is a flowchart of another control process of the server device. Fig. 9 illustrates an example of a failure cause displayed on the user terminal. Fig. 10 illustrates an example of a failure cause displayed on the user terminal. Fig. 11 is a schematic configuration diagram of a maintenance assistance system according to an embodiment.
    [0020]Description of Embodiments
    [0021][0011]In the following, reference is made to the drawings to describe embodiments of the component life prediction system and the maintenance assistance system according to the present invention. Before describing the embodiments, the context leading to the present invention will be discussed.
    [0022][0012]A work machine, such as a hydraulic excavator, is used in various industries. Depending on the industry, the operation environment of the hydraulic excavator varies greatly, and so the extent of wear of components of the hydraulic excavator and the cause of failure also vary. For example, even for the same type of hydraulic excavator, a hydraulic excavator used for wrecking is subjected to greater damage to the claw teeth of an attachment thereof than for other industries, such as scrapping and industrial waste disposal, and the claw teeth of the attachment wear faster.
    [0023][0013]Further, consider the same type of hydraulic excavator used in the respective industries of crushing stones, industrial waste disposal, civil engineering, renting, scrapping, and wrecking. With regard to the sprocket teeth as an example, the tendencies are that the amount of wear of the sprocket teeth is the smallest for the renting industry, and the amount of wear of the sprocket teeth is the greatest for the scrapping industry. This is presumably because of the presence of more metal pieces in a scrap yard compared to other industries. As the metal pieces are caught between the sprocket teeth and the links of the hydraulic excavator, the work machine travels while crunching the metal pieces being caught, thus accelerating the wear of the sprocket teeth.
    [0024][0014]Meanwhile, with regard to the shoe lug as an example, the tendencies are that the amount of wear of the shoe lug is the smallest for the renting industry, and the amount of wear of the shoe lug is the greatest for the stone-crushing industry. This is presumably because of the presence of a large number of crushed stones that are hard and pointed in a quarry, causing greater damage to the shoe lug.
    [0025][0015]Accordingly, the present inventors focused on the variations in the extent of wear and the cause of failure of work machine components between different industries, and discovered that the accuracy of prediction of the life of a component can be increased by estimating the industry in which the work machine is used, and then considering the operation environment and an operational feature of the work machine in the estimated industry, thereby arriving at the present invention.
    [0026][Component life prediction system]
    [0027][0016]Fig. 1 is a schematic configuration diagram of a component life prediction system according to an embodiment. As illustrated in Fig. 1 , the component life prediction system 1 comprises a work machine 2, a work machine management server 3, an aerial photo management server 4, a server device 10 for predicting the life of a component of the work machine 2, and a user terminal 5. The work machine 2, the work machine management server 3, the aerial photo management server 4, the server device 10, and the user terminal 5 are configured to be able to communicate with each other via a network 6.
    [0028][0017]In the present embodiment, a hydraulic excavator will be described as an example of the work machine 2. However, the work machine 2 is not limited to a hydraulic excavator and may be a wheel loader, a bulldozer, and the like. The work machine 2 is not limited to a single work machine and may include a plurality of work machines. Each work machine 2 is given an identification number.
    [0029][0018]As illustrated in Fig. 1 , the work machine 2 includes a communication section 21, a vehicle body controller 22, a storage section 23, and an in-vehicle sensor 24. The communication section 21 is a wireless device, for example, for connection with the network 6. The communication section 21, for example, transmits various data detected by the in-vehicle sensor 24 to the work machine management server 3; transmits operation information of the work machine 2 to the work machine management server 3 periodically (such as at the frequency of once every day); and transmits component replacement information of the work machine 2 to the work machine management server 3. The communication section 21 receives an update program for the vehicle body controller 22 transmitted from the work machine management server 3. When the various data detected by the in-vehicle sensor 24, the operation information, and the component replacement information are transmitted to the work machine management server 3, the communication section 21 transmits the identification number of the work machine 2 at the same time.
    [0030][0019]The vehicle body controller 22 is composed of a microcomputer consisting of a combination of, e.g., a central processing unit (CPU) for performing computations, a read-only memory (ROM) as a secondary storage device in which a program for computations is recorded, and a random access memory (RAM) as a temporary storage device for saving the course of computations and temporary control variables. The vehicle body controller 22 executes the stored program to control the work machine 2 as a whole.
    [0031][0020]The storage section 23 stores a program for controlling the work machine 2, data detected by the in-vehicle sensor 24, and the like. The in-vehicle sensor 24, which includes various sensors attached to the work machine 2, detects various data regarding the operation of the work machine 2, and outputs the detected data to the vehicle body controller 22. The in-vehicle sensor 24 may include, for example, inertial measurement units (IMU) for respectively detecting the inclinations of the arm, boom, and bucket of the work machine 2; a swing angle sensor for detecting the swing angle of a swing body of the work machine 2; and a travelling operation sensor for detecting a travelling operation.
    [0032][0021]The work machine 2 is also equipped with a global positioning system (GPS) sensor 25. The GPS sensor 25 has an antenna for receiving a signal from a GPS satellite, and detects information about the operation location of the work machine 2 in a terrestrial coordinate system, based on a time difference of signals received from a plurality of GPS satellites.
    [0033][0022]The work machine management server 3 is installed at the head office, a branch office, a factory, or a management center of the manufacturer of the work machine 2, and periodically collects the operation information and component replacement information and the like transmitted from the work machine 2 to perform central management of the work machine 2. The work machine management server 3 is composed of, e.g., a microcomputer consisting of a combination of a central processing unit (CPU) for performing computations; a read-only memory (ROM) as a secondary storage device in which a program for computations is stored; and a random access memory (RAM) as a temporary storage device for saving the course of computations and temporary control variables. The work machine management server 3 executes various processes by performing the stored program.
    [0034][0023]The work machine management server 3 includes a communication section 31, a daily operation report table 32, a component replacement history table 33, and a client information table 34. The communication section 31 is, e.g., a wireless device for connection with the network 6. The communication section 31, for example, receives the operation information, component replacement information, and the like transmitted from the work machine 2, and transmits the operation information of the work machine 2 to the server device 10 in accordance with a request from the server device 10.
    [0035][0024]The daily operation report table 32 is created based on the operation information transmitted from the work machine 2. The daily operation report table 32 stores, as illustrated in Fig. 3 for example, items such as "Machine number", "Date of operation", "Operation time", "Travelling time", "Excavation time", "Swing time", "Fuel consumption", "Latitude", and "Longitude". The machine number is the identification number of the work machine 2. The date of operation is the date of reception of the operation information transmitted from the work machine 2. The operation time, travelling time, excavation time, swing time, and fuel consumption are calculated based on data detected by the in-vehicle sensor 24 of the work machine 2. The latitude and longitude are detected by the GPS sensor 25 of the work machine 2. Instead of the "Date of operation", "Date/time of operation" may be used.
    [0036][0025]The component replacement history table 33 is created based on the component replacement information transmitted from the work machine 2. The component replacement history table 33 describes items such as, as illustrated in Fig. 4 for example, "Machine number", "Date of replacement", "Replacement component number", and "Number of items". The client information table 34 is used to manage information about clients, i.e., the users of the work machine 2. The client information table 34 describes, as illustrated in Fig. 5 for example, "Machine number" and "Client name".
    [0037][0026]The aerial photo management server 4 collects and manages aerial photos taken at various areas of the world, and provides them externally via the network 6. Preferably, the aerial photos, which may be referred to as photos taken from the sky, are periodically updated. The aerial photo management server 4 includes a communication section 41, an aerial photo storage section 42 for storing aerial photos, and a map information storage section 43 for storing map information. The aerial photo management server 4 may not include the map information storage section 43.
    [0038][0027]Further, the aerial photo management server 4 extracts an aerial photo corresponding to certain latitude and longitude (for example, the operation location of the work machine 2) from the aerial photo storage section 42 in accordance with a request from the work machine management server 3 or the server device 10, and transmits the extracted photo to the work machine management server 3 or the server device 10.
    [0039][0028]The user terminal 5 is, e.g., a smartphone, a tablet terminal, a cell phone, a personal computer (PC) or the like, and is carried by a maintenance worker, an owner or the like of the work machine 2. The user terminal 5 includes a communication section 51, an information acquisition section 52 for acquiring information transmitted from the server device 10, and a display section 53 comprising a display for displaying the acquired information.
    [0040][0029]The server device 10 is composed of, e.g., a microcomputer consisting of a combination of a central processing unit (CPU); a read-only memory (ROM) as a secondary storage device in which a program for computations is stored; and a random access memory (RAM) as a temporary storage device for saving the course of computations and temporary control variables. The server device 10 executes the stored program to perform processes of calculation, prediction, estimation, and the like.
    [0041][0030]In the present embodiment, the server device 10 estimates the industry in which the work machine 2 is used, based on the operation information of the work machine 2 transmitted from the work machine management server 3, and the aerial photo transmitted from the aerial photo management server 4; predicts the life of a component of the work machine 2, based on the estimated industry; and further estimates the cause of failure of the component. Accordingly, the server device 10 of the present embodiment includes a communication section 11, an information acquisition section 12, an industry estimation section 13, a component life prediction section 14, and a failure cause estimation section 15.
    [0042][0031]The communication section 11 is, e.g., a wireless device for connection with the network 6. For example, the communication section 11 receives the operation information of the work machine 2 transmitted from the work machine management server 3 and the aerial photo transmitted from the aerial photo management server 4, and transmits various information obtained from the server device 10 to the user terminal 5. The information acquisition section 12 acquires, via the communication section 11, the operation information of the work machine 2 from the work machine management server 3 and the aerial photo from the aerial photo management server 4, and stores the acquired information.
    [0043][0032]The industry estimation section 13 estimates the industry in which the work machine 2 is used, based on the operation information of the work machine 2 acquired by the information acquisition section 12 and the aerial photo of the operation location of the work machine 2. Specifically, the industry estimation section 13 first identifies the industry in which the work machine 2 has been used in the past, and associates the identified industry with the aerial photo of the operation location of the past use, to thereby create teacher data for machine learning. The industry estimation section 13 further performs machine learning by deep learning with respect to the created teacher data, to build an industry estimation model. Then, the industry estimation section 13, using the industry estimation model that has been built, estimates the industry in which the work machine 2 is used, based on the operation information of the work machine 2 and the aerial photo of the operation location of the work machine 2.
    [0044][0033]More specifically, when building the industry estimation model, the industry estimation section 13 first extracts operation location information (namely, latitude and longitude) included in the past operation information of the work machine 2 acquired by the information acquisition section 12. Then, the industry estimation section 13 acquires the aerial photo corresponding to the extracted longitude and latitude (namely, the aerial photo of the operation location), from the aerial photo management server 4 via the information acquisition section 12 and the communication section 11.
    [0045][0034]Then, the industry estimation section 13, using the acquired aerial photo of the operation location of the work machine 2 and the identified industry in which the work machine 2 has been used, creates teacher data for machine learning (namely, a group of aerial photo files with the names of industries). The industry estimation section 13 then performs deep learning with respect to the created teacher data to automatically extract respective features, thereby performing industry classification and building the industry estimation model. The industries herein include, for example, scrapping; raw material extraction, such as quarrying and collection of river sand; industrial waste disposal; civil engineering; wrecking; road construction; steels/metals; forestry; harbor loading/unloading; recycling; agriculture; and renting.
    [0046][0035]Further, the industry estimation section 13 of the present embodiment estimates, by decision tree classification, for example, the industry in which the work machine 2 is used, based on the acquired operation information of the work machine 2 and an operational feature of the work machine 2 in each industry created in advance. Herein, the work machine has a tendency of operation (hereafter referred to as "operational feature") that is performed frequently depending on the industry (site of operation). The operational feature, in other words, is the characteristic way in which the work machine 2 is used in each industry.
    [0047][0036]Specifically, the industry estimation section 13 performs industry classification according to decision tree classification, based on the operational feature of the work machine 2, as illustrated in Fig. 6 for example, in which the horizontal axis shows the industry (scrapping, raw material extraction, industrial waste disposal, civil engineering), and the vertical axis shows the operational feature (mounting/operating of an attachment; excavation load; amount of swing operation; no-operation time; and travelling frequency). In Fig. 6 , the double-circles indicate that the abundance of the key is high; the single circles indicate that the abundance of the key is moderate; and the triangles indicate that the abundance of the key is low. The "key" refers to an operation of the work machine characteristic to the industry.
    [0048][0037]For example, with respect to the example of mounting/operating of an attachment in Fig. 6 , among scrapping, raw material extraction, industrial waste disposal, and civil engineering, scrapping has the feature that the mounting/operating of an attachment occurs more often compared to raw material extraction, industrial waste disposal, and civil engineering. Likewise, with respect to the example of excavation load, among scrapping, raw material extraction, industrial waste disposal, and civil engineering, industrial waste disposal has the feature that the excavation load is smaller compared to scrapping, raw material extraction, and civil engineering. The information concerning the mounting/operating of an attachment, excavation load, amount of swing operation, no-operation time, and travelling frequency is obtained from the daily operation report of the work machine 2.
    [0049][0038]As the operational feature of the work machine 2 in each industry, in the case of scrapping, sorting and unloading of metals and the like by means of a lifmag ("lifting magnet") or a fork often occurs. In the case of raw material extraction, surface-earth removal, excavation/loading, plant loading by means of a bucket, and secondary-crushing by a breaker often occur. Further, in the case of industrial waste disposal, unloading by means of a bucket or a fork, leveling work, moving of industrial waste, surface-earth covering, and compacting work often occur. In the case of civil engineering, excavation/loading of earth/sand, moving of earth/sand, ground leveling, and laying/leveling by means of a bucket often occur, and swing operations tend to occur more often compared to the others.
    [0050][0039]The operational feature of the work machine 2 in each industry may also concern a difference in the moving distance of the work machine 2. For example, in the industrial waste disposal, scrapping, recycling, agriculture, steel/iron-making, and wrecking industries, the operating range of the work machine is limited to within a certain area, so that the moving distance of the work machine is within about 100 m and the travelling frequency is low. In the harbor loading/unloading, raw material extraction, civil engineering, and road construction industries, the moving distance of the work machine is within about 500 m, for example. Meanwhile, in the stone-crushing industry, the moving distance of the work machine is greater and within about 1 km, for example. In the forestry industry, the moving distance of the work machine is even greater and within about 3 km, for example, and the travelling frequency is higher.
    [0051][0040]Accordingly, the industry estimation section 13 can utilize the difference in moving distance in each industry (in other words, the characteristic of moving distance in each industry) to perform industry classification. The moving distance of the work machine 2 can be obtained from the daily operation report of the work machine 2.
    [0052][0041]Further, in the present embodiment, the industry estimation section 13 uses the result of industry estimation based on the operation information of the work machine 2 and the operational feature of the work machine 2 in each industry, to increase the accuracy of the industry estimation model built by the machine learning performed with respect to the aerial photo. That is, the industry estimation section 13, by combining the result of industry estimation based on the operation information of the work machine 2 and the operational feature of the work machine 2 in each industry, with the result of industry estimation obtained by performing machine learning with respect to the aerial photo, can build a highly accurate industry estimation model. In this way, the accuracy of industry classification can be further improved.
    [0053][0042]When it is desired to estimate the industry in which a certain work machine 2 is used, the industry estimation section 13 acquires the aerial photo of the operation location of the work machine 2 from the aerial photo management server 4, based on information about the operation location of the work machine 2, and estimates the industry in which the work machine 2 is used, based on the acquired aerial photo and the industry estimation model built as described above.
    [0054][0043]In this case, the industry estimation section 13 preferably performs further industry estimation, based on the operation information of the work machine 2 for which the industry is desired to be estimated and the operational feature of the work machine 2 in each industry, and combines the result of this estimation with the result of industry estimation based on the aerial photo and the industry estimation model, to increase the accuracy of industry estimation. Further preferably, the estimation result of the industry estimation section 13 is fed back to the teacher data for machine learning.
    [0055][0044]The component life prediction section 14 predicts the life of a component of the work machine 2, based on the industry estimated by the industry estimation section 13. Specifically, the component life prediction section 14 uses pre-created graphs, tables and the like of the relationship between the operation time and wear rate of a model component for each industry, and predicts the life of the model component of the industry, based on the operation time of the work machine 2 (total operation time). In the present embodiment, the life of a component means a remaining use time of the component assuming the operation will continue under the current use conditions. The model component for each industry may be a single component or include a plurality of components.
    [0056][0045]The component life prediction section 14 also refers to a component replacement history stored in the component replacement history table 33 of the work machine management server 3 to predict the life of the model component. For example, when a certain model component is replaced, the total operation time regarding the component is reset and re-computed.
    [0057][0046]The failure cause estimation section 15 estimates a failure cause, based on the industry estimated by the industry estimation section 13, taking the failure tendency of the work machine 2 in the industry into consideration. The failure tendency of the work machine 2 for each industry is extracted by statistically processing the past failure causes in each industry.
    [0058][0047]For example, if the industry is scrapping, metal pieces in the scrap yard often become pinched between the undercarriage components of the hydraulic excavator, and travelling component failures due to such pinching of metal pieces tend to occur often. Thus, if it is estimated that the industry in which the work machine 2 has been used is scrapping and abnormality is detected in a travelling component, the failure cause estimation section 15 makes an estimation focusing on whether the failure is caused by the pinching of metal pieces, taking the above failure tendency into consideration.
    [0059][0048]Further, if the industry is civil engineering, dirt and sand are likely to enter components such as an air cleaner, tending to cause abnormal combustion of the engine. Thus, if it is estimated that the industry in which the work machine 2 has been used is civil engineering and abnormal combustion of the engine occurs, the failure cause estimation section 15 makes an estimation focusing on whether the cause is entry of dirt or sand into the air cleaner.
    [0060][0049]Then, the server device 10 transmits the result estimated by the industry estimation section 13, the result predicted by the component life prediction section 14, and the result estimated by the failure cause estimation section 15 to the user terminal 5.
    [0061][0050]In the following, reference is made to Fig. 2 to describe a control process of the server device 10.
    [0062][0051]First, in step S11, the information acquisition section 12 of the server device 10 acquires the operation information of the work machine 2 from the work machine management server 3 via the communication section 11. In step S12 following step S11, the information acquisition section 12 extracts information about the operation location (latitude and longitude) of the work machine 2 from the acquired operation information of the work machine 2, acquires the aerial photo of the operation location from the aerial photo management server 4 via the communication section 11, and stores them. The operation information acquisition (step S11) and aerial photo acquisition (step S12) herein are automatically performed by the information acquisition section 12 at a constant period, for example.
    [0063][0052]In step S13 following step S12, the industry estimation section 13 creates teacher data for machine learning, based on the acquired operation information and aerial photo, and builds the industry estimation model, as described above.
    [0064][0053]In step S14 following step S13, the server device 10 acquires the information about the operation location (latitude and longitude) of the work machine 2 of which the life of a component is desired to be predicted, and acquires an aerial photo from the aerial photo management server 4 in accordance with the latitude/longitude information. With respect to the work machine 2 of which the life of a component is desired to be predicted, the server device 10 may make a decision in accordance with an instruction from the work machine management server 3, or may make a decision on its own accord.
    [0065][0054]In step S15 following step S14, the industry estimation section 13 estimates the industry in which the work machine 2 of which the life of a component is desired to be predicted has been used, based on the acquired aerial photo and operation information of the work machine 2, as described above. That is, industry estimation is performed using both the industry estimation based on the aerial photo and the industry estimation model, and the industry estimation based on the operation information of the work machine 2 and the operational feature of the work machine 2 in each industry.
    [0066][0055]In step S16 following step S15, the component life prediction section 14 predicts the life of a model component for each industry, based on the result of industry estimation in step S15. The model component refers to a component serving as a benchmark (index) for life prediction. Specifically, the server device 10 initially extracts a model component for a particular industry, based on the result of industry estimation in step S 15. For example, if it is estimated in step S15 that the industry in which the work machine 2 has been used is scrapping, the server device 10 extracts a sprocket as the model component for the scrapping industry.
    [0067][0056]Then, the component life prediction section 14 predicts the life of the sprocket, based on the operation time (total operation time) of the work machine 2 on the basis of a pre-created graph of the relationship between the operation time and wear rate of the sprocket. Further, the component life prediction section 14 calculates a replacement time for the sprocket, based on the predicted life of the sprocket.
    [0068][0057]In step S17 following step S16, the server device 10 determines whether the replacement time of the model component for each industry is greater than or equal to a threshold value. For example, the server device 10 compares the replacement time for the sprocket calculated by the component life prediction section 14 with a preset threshold value, and determines whether the replacement time for the sprocket is greater than or equal to the threshold value. The threshold value herein is a guide for issuing an alarm calling for attention, and is set to 90% of the replacement time, for example. The threshold value may be changed as appropriate depending on the situation.
    [0069][0058]If it is determined that the model component replacement time for each industry is not greater than or equal to the threshold value, the control process ends. On the other hand, if it is determined that the model component replacement time for each industry is greater than or equal to the threshold value, the control process proceeds to step S18. In step S18, the server device 10 notifies the user terminal 5 of the alarm via the communication section 11, and also transmits a mail with an address for confirming an accumulated damage of the component and a predicted value before replacement to the user terminal 5.
    [0070][0059]The accumulated damage of the component is calculated with reference to the proportions of the industries in which the work machine 2 has been used in the past. As an example, if the proportions of the industries in which the work machine 2 has been used in the past is 70% scrapping and 30% industrial waste disposal, the calculation is performed according to "accumulated damage (%) = coefficient for scrapping industry × 70% + coefficient for industrial waste disposal industry × 30%". The coefficient for scrapping industry is set to 1, and the coefficient for industrial waste disposal industry is set to 0.5, for example. Further, if the proportions of the industries in which the work machine 2 has been used in the past is 50% raw material extraction and 50% civil engineering, the calculation is performed according to "accumulated damage (%) = coefficient for raw material extraction industry × 50% + coefficient for civil engineering industry × 50%". The predicted value before replacement is a value indicating how much time there is before the component reaches the threshold value for its life. In this case, a graph indicating the correlation between the level of damage to the component and the replacement time may also be transmitted to the user terminal 5 at the same time.
    [0071][0060]Then, when the address attached to the received mail is clicked on the user terminal 5, as illustrated in Fig. 7 , a message such as "If keep operating under current use conditions, life threshold value will be reached in 100 hours. Consider placing an order for component." is displayed on the display section 53. The message is not limited to a text message, and may be instead in the form of simplified classifications, such as, in order of decreasing life threshold value: "A (replacement recommendation level: high)", "B (replacement recommendation level: intermediate)", and "C (replacement recommendation level: low)". The owner or the like of the work machine 2, seeing the displayed message, can know the life of a component easily, and will therefore be able to make a component purchase plan more easily. Further, the message is not limited to a text display, and may show, e.g., a diagrammatic figure of the work machine, with a relevant portion blinking. The blinking may be configured such that different colors such as red, yellow, and blue are displayed in order of decreasing life threshold value (the closest replacement time shown first), wherein a blinking portion may be tapped to show further information (summary) about the failure. The failure portion may be enlarged or shrunk as desired by a pinch-in or pinch-out operation performed on the operating screen of the user terminal. In this way, the accumulated damage at and the life of a portion of the work machine 2 can be intuitively and visually confirmed. It also becomes possible to know a summary of responses including the replacement time.
    [0072][0061]The model component for each industry may be a single component or include a plurality of components. In the case of a plurality of model components, the life prediction is made and the replacement time is calculated for each model component in step S 16, and a comparison of the replacement time and the threshold value for each model component is performed in step S17. If it is determined that the replacement time for one of the plurality of model components is greater than or equal to the threshold value, alarm notification and mail transmission to the user terminal 5 are performed.
    [0073][0062]The server device 10 configured as described above includes: the information acquisition section 12 that acquires the operation information of the work machine 2 including the information about the operation location of the work machine 2, and the aerial photo of the operation location of the work machine 2; the industry estimation section 13 that estimates the industry in which the work machine 2 is used by machine learning, based on the acquired operation information of the work machine 2 and aerial photo of the operation location; and the component life prediction section 14 that predicts the life of a component of the work machine 2, based on the estimated industry. In this way, it is possible to take into consideration the operation environment and operational feature of the work machine 2 in each industry, and to then perform component life prediction tailored to the industry. Thus, increased prediction accuracy can be obtained.
    [0074][0063]As a result, it becomes possible to make suggestions to the user, a business agency or the like of the work machine 2 for component replacement in a timely manner. Thus, a loss of operation time due to component failure can be prevented. Further, by building the industry estimation model by machine learning using the operation information of the work machine 2 and the aerial photo of the operation location of the work machine 2, the accuracy of the industry estimation model that is built can be increased, and the industry can be estimated even for a new construction site.
    [0075][0064]The control process of the server device 10 of the present embodiment is not limited to the foregoing, and a control process illustrated in Fig. 8 may be performed, for example.
    [0076][0065]Step S21 to S23 of Fig. 8 are the same as step S11 to S13 described above, and, therefore, duplicate descriptions are omitted. In step S24 following step S23, the failure cause estimation section 15, as described above, statistically processes the past failure causes for each industry and extracts the failure tendency of the work machine 2 for each industry.
    [0077][0066]In step S25 following step S24, the server device 10 determines whether abnormality is detected. Specifically, the server device 10 determines whether abnormality is detected based on the result of detection made by the in-vehicle sensor 24 of the work machine 2 and transmitted via the communication section 21. Step S25 is repeated until abnormality is detected.
    [0078][0067]If it is determined that there is detection of abnormality (YES), the control process proceeds to step S26. In step S26, the industry estimation section 13 estimates the industry of the work machine 2 in which the abnormality has been detected, based on the acquired aerial photo and operation information of the work machine 2, as described above. Specifically, the information acquisition section 12 of the server device 10 acquires information about the operation location (latitude and longitude) of the work machine 2 in which the abnormality has been detected, and acquires the aerial photo of the operation location from the aerial photo management server 4. Then, the industry estimation section 13 performs the same process as step S15 described above, and performs industry estimation for the work machine 2 in which the abnormality has been detected.
    [0079][0068]In step S27 following step S26, the failure cause estimation section 15, using the failure tendency of the work machine 2 extracted for each industry in step S24, estimates the failure cause regarding the abnormality detected in step S25.
    [0080][0069]In step S28 following step S27, the server device 10 notifies the user terminal 5, via the communication section 11, of an alarm indicating that a component may have failed. Also, the server device 10 transmits a mail with an address enabling confirmation of, e.g., an estimated cause of the failure to the user terminal 5.
    [0081][0070]Then, if the addressed attached to the received mail is clicked on the user terminal 5, contents concerning "Failure alarm name", "Estimated industry", and "Estimated cause" are displayed on the display section 53, as illustrated in Fig. 9 and Fig. 10 . For example, in the example illustrated in Fig. 9 , the industry is estimated to be civil engineering, and the cause of the abnormal combustion failure is estimated to be possible entry of sand into an engine component. In the example illustrated in Fig. 10 , the industry is estimated to be scrapping, and the cause of the travelling component failure is estimated to be possible pinching of metal pieces between undercarriage components. Thus, the owner or the like of the work machine 2, seeing the displayed contents, can easily know the failure cause and take measures and the like with respect to the failure. In this way, it is also possible to improve the work efficiency of the maintenance worker for the work machine 2. As in Fig. 7 , the display of the failure cause is not limited to text display. That is, the failure contents corresponding to the failure alarm may be displayed by showing a diagrammatic figure representing the silhouette of the work machine, and blinking the relevant portion. In this case, as in the example of Fig. 7 , the blinking portion may be tapped to display additional information such as the estimated industry, wherein the probability may be indicated in percentage. If the probability of the estimated industry is close between at least two industries (for example, civil engineering (45%), industrial waste disposal (40%)), the industry with a highest probability and the industry with a next highest probability are shown together. The range of closeness may be set as desired. Such notation allows the maintenance worker for the work machine 2 to intuitively know information about the failure, and to make flexible preparations assuming the next-likely industry when identification of the estimated industry with the highest probability is difficult.
    [0082][Maintenance assistance system]
    [0083][0071]In the following, a maintenance assistance system 100 is described with reference to Fig. 11 . The maintenance assistance system 100 differs from the component life prediction system 1 described above in the structure of a server device 10A. The other structures are similar to the component life prediction system 1 and are therefore given similar signs to those of the component life prediction system 1, and duplicate descriptions are omitted.
    [0084][0072]As illustrated in Fig. 11 , the maintenance assistance system 100 is a system for assisting maintenance work of a maintenance worker or the like. The maintenance assistance system 100 includes a work machine management server 3 that collects operation information of the work machine 2 including operation location information, an aerial photo management server 4 that stores an aerial photo based on position information, and the server device 10A. The server device 10A is configured to be able to communicate with each of the work machine management server 3 and the aerial photo management server 4. As in the component life prediction system 1 described above, the work machine management server 3 transmits the collected operation information of the work machine 2 to the server device 10A. The server device 10A transmits the operation information of the work machine 2 to the aerial photo management server 4. The aerial photo management server 4 extracts an aerial photo corresponding to the operation location information included in the operation information of the work machine 2, and transmits the aerial photo to the server device 10A.
    [0085][0073]The server device 10A also estimates the industry in which the work machine 2 is used based on the operation information of the work machine 2 and the aerial photo of the operation location of the work machine 2. Further, the server device 10A estimates the industry in which the work machine 2 is used based on the operation information of the work machine 2 and the operational feature of the work machine 2 in each industry.
    [0086][0074]Compared to the server device 10 of the component life prediction system 1 described above, the server device 10A does not include a component life prediction section 14 and a failure cause estimation section 15, and is only composed of a communication section 11, an information acquisition section 12, and an industry estimation section 13. The server device 10A transmits the result of industry estimation by the industry estimation section 13 to a terminal of the maintenance worker (namely, user terminal 5). Preferably, the server device 10A transmits prediction accuracy as well as the result of industry estimation. The maintenance worker, seeing the transmitted results, can know the industry in which the work machine 2 is used, and, moreover, can carry maintenance tools suitable for the industry to the site. This can prevent an increase in the burden on the maintenance worker due to carrying unnecessary tools, and improve the efficiency of the maintenance work.
    [0087][0075]According to the maintenance assistance system 100 of the present embodiment, as with the component life prediction system 1 described above, it is possible to increase the prediction accuracy of prediction of the life of a component of the work machine 2. Thus, the efficiency of the maintenance work can be improved.
    [0088][0076]While the embodiments of the present invention are described above, the present invention is not limited to the foregoing embodiments, and various design modifications may be made without departing from the spirit of the present invention set forth in the following claims.
    [0089]Reference Signs List
    [0090][0077]1 Component life prediction system 2 Work machine 3 Work machine management server 4 Aerial photo management server 5 User terminal 10, 10A Server device 11 Communication section 12 Information acquisition section 13 Industry estimation section 14 Component life prediction section 15 Failure cause estimation section 24 In-vehicle sensor 25 GPS sensor 32 Daily operation report table 33 Component replacement history table 42 Aerial photo storage section 53 Display section 100 Maintenance assistance system
    同族专利
    暂无同族专利