The current electron cyclotron resonance heating (ECRH) system at the stellarator Wendelstein 7-X (W7-X) is in the phase to increase the gyrotron output power from 1 MW to 1.5 MW and, last, up to the target of 2 MW by different steps. The higher heating power shall allow achieving operating regimes with high plasma beta and low collisionality, required by the planned further experimental campaigns. Previous numerical analyses verified the design of the gyrotron diamond output window up to 1.5 MW operation, with temperature dependent material properties. The window must be cooled by water, to assure significant temperature reserve margins. In this work, the investigation of the window performance was further carried on for the target of 2 MW operation. Computational fluid dynamics (CFD) conjugated heat transfer and structural analyses were performed. The sensitivity of the design was checked with respect to different combinations of loss tangent and mm-wave beam radius. The operational limits of the window were also checked. The current design features conical cuffs and a slightly different cooling path with respect to the past. For the first time, the complete window assembly and both the thermal and other operational loads were considered in the analyses. They showed that the window design can work also at 2 MW operation. The maximum loss tangent value of the diamond disk that might be still tolerated is 5.7 & times; 10-5, corresponding to an absorbed power of 2008 W, with a beam radius of 20 mm. Last, going to higher absorbed powers in the disk, maximum temperatures can be significantly reduced by increasing the beam radius within the limits which are however imposed by the window aperture.
Nuclear fusion devices feature electron cyclotron resonance heating systems for plasma heating and stabilization, with diamond windows acting as vacuum and safety confinement barriers. Diamond is the only option for long-pulse operation in the MW-range applications, given its exceptional combination of optical, thermal and mechanical properties. Dielectric measurements have qualified almost one hundred disks of artificial diamond for their integration into metallic structures to form the complete windows. Optical and mechanical investigations of the disks, together with dedicated numerical analyses of the windows, complete the characterization of these essential components in nuclear fusion.
The 140 GHz 1 MW gyrotron (Thales TH1507) for the electron cyclotron resonance heating (ECRH) system at the stellarator Wendelstein 7-X (W7-X) is being upgraded to 1.5 MW continuous wave operation to increase the total heating power for achieving operating regimes with high plasma beta and low collisionality. The design of the new 1.5 MW gyrotron (Thales TH1507U) has been significantly improved to the new power target. It features a chemical vapor deposition (CVD) diamond output window cooled by the silicon oil Dow Corning 200(R) 5cSt, in direct contact with the circumference of the diamond disk. The oil has been selected to prevent any corrosion of the brazing material between diamond disk and copper cuffs. Previous analyses verified the suitability of the window design for both, operation at 1 MW and at 1.5 MW if assuming constant properties for diamond and copper. In this work, the window is investigated by computational fluid dynamics conjugated heat transfer and structural analyses with temperature dependent material properties to assess its performance if cooled by water and oil at different absorbed powers in the disk. Temperature dependent properties are assumed as, at those power levels, the disk achieves temperature ranges at which, the reduction of the diamond thermal conductivity becomes remarkable. Otherwise, the maximum achieved temperatures are deeply underestimated. Both water- and oil-cooled window cases work up to about 1.2 kW absorbed power in the disk, with temperatures and stresses lower than the maximum allowed limits. However, it is of fundamental importance to assure high temperature reserve margins in the window to counteract any potential degrading factor of the disk quality from microwave transmission perspective. Water-cooling represents the only solution as it provides significant margins, even at higher values of absorbed power. In the worst-case scenario of 1.5 kW absorption, the maximum temperature in diamond is 173 degrees C while the oil-cooling option would lead to temperatures well above the 250 degrees C design safe limit.
Vacuum windows are required in magnetically confined fusion experiments to provide possibilities to observe the plasma in a wide range of electromagnetic wavelengths. The window disk consists of a dielectric, e.g. Fused Silica (SiO2), Sapphire or Chemically Vapourised Diamond (CVD). As electromagnetic waves pass through the disk, a fraction of the beam power is dissipated resulting in a temperature increase of the disk. In Electron Cyclotron Waves (ECW) heated plasmas the dissipation in the window disk can be very high. The computation of dielectric losses for a collimated beam with known incidence angle, polarisation and loss tangent (measure for the intrinsic dielectric loss) is well established. However, the dielectric losses in diagnostic windows mostly result from microwave stray radiation, which results from a modest, but inevitable, fraction of non-absorbed ECW. This fraction diffuses in the vessel by many reflections into rays with random k-vector and with random polarisation. In this work the thermal load on the window disk by microwave stray radiation is assessed. The load by a collimated beam is studied as a function of incidence angle and polarisation allowing to average over a distribution of incident rays. An experiment was commissioned measuring the loss tangent of a number of commercially available SiO2 disks at low power in an open resonator, and subsequently measuring the dielectric heating of these disks at high power stray radiation using the facility ’MISTRAL’ at Wendelstein-7X. The experimental results are compared to modelling and it is demonstrated that, in the parameter range considered, single-pass fractional absorption may be applied while taking a safety margin that arises from the minima and maxima due to multiple reflections.
The 10 MW electron cyclotron resonance heating (ECRH) system at the stellarator Wendelstein 7-X (W7-X) currently relies on the successful operation of continuous wave (CW) 1 MW, 140 GHz gyrotrons which have chemical vapor deposition (CVD) diamond output windows cooled by the industrial silicon oil Dow Corning 200 (R) 5 cSt. The window features a 1.8 mm thick diamond disk brazed to two copper cuffs with an aperture of 88 mm, which are then integrated in a steel housing. In the context of the upgrade of the ECRH system towards higher microwave power, this gyrotron design has been significantly advanced to fulfill the requirement of 1.5 MW CW operation, still at 140 GHz. A prototype of this new gyrotron is under development at Thales, France. This paper reports the computational fluid dynamics (CFD) conjugated heat transfer and structural analyses of the diamond window performed using the commercial code ANSYS V19.2 to investigate its performance at 1.5 MW operation. Furthermore, sensitivity studies were also carried out with respect to the absorbed power in the disk and the mm-wave beam radius at the window location. These analyses showed that the window design of the existing 1 MW gyrotrons still works quite well at higher power operation, thus verifying the performance of the window. Even in the worst case scenario of 1.5 kW absorbed power, the maximum temperature of 215 degrees C at the disk center can be safely accepted, being below the conservative limit of 250 degrees C for CVD diamond. In addition, the non-axial symmetric thermal gradients due to the geometry of the cooling channels lead to thermal stresses in the disk and the cuffs. However, they are much lower than the limits. The copper cuffs experience plasticity deformation in the region of the interface with the diamond disk up to a value of about 1.5 mm.
In the frame of the EUROfusion Work Package Heating and Current Drive (WP HCD) of the Power Plant Physics and Technology (PPPT) program, CVD diamond disk Brewster-angle windows for gyrotron operation at multi-megawatt RF power levels and long pulses are under development. These windows allow for frequency step-tuneable operation. The Brewster-angle of 67.2 degrees for diamond leads to an elliptical connection of the disk to the copper waveguides (WGs), requiring an advanced joining process. For proper transmission of the RF power, the disk consists of low loss CVD diamond of optical grade. The current target for the WG aperture of DEMO is 63.5 mm. It allows for an RF power transmission of 2 MW, but it requires a disk diameter of 180mm for the 67.2 degrees angle. In addition, a thickness of approximately 2mm is needed to achieve the proper mechanical stability. State of the art microwave plasma reactors are not capable of growing disks of such size. The maximum available diameter of a polycrystalline CVD diamond disk suited to microwave applications is currently 140 mm. Thus, the industrial partner Diamond Materials GmbH (Freiburg, Germany) is doing extensive diamond growth experiments. A first of its kind, 180mm thermal grade, crack-free, diamond disk was produced in the microwave plasma reactor with an average unpolished thickness of about 2 mm. First loss tangent measurements have been also performed. This paper describes the steps and the first results of this non-straightforward path, a challenging new field for diamond manufacturers and a major breakthrough for future frequency step-tuneable operation.
The chemical vapour deposition (CVD) diamond torus window unit is a sub-component of the ITER Electron Cyclotron Heating and Current Drive (EC H&CD) system used for a diverse range of applications including plasma heating and control of plasma magneto-hydrodynamic (MHD) instabilities. It consists of an ultra-low loss polycrystalline diamond disk brazed to copper cuffs and then enclosed by a metallic structure. The diamond disk with 1.11 mm thickness already passed successfully the ITER final design review (FDR) in 2018. In view of the complete window assembly FDR, prototyping activities of the window are essential and, therefore, they shall start soon in order to check the feasibility of the proposed manufacturing and assembling sequence of the component. In this perspective, as the design of the systems surrounding the window is currently in development phase, the paper describes the finite element method (FEM) analyses of the window to carry out with the aim to prove the soundness of the design used for the prototyping and also to define requirements for the surrounding systems. Specific methodologies are adopted such as the limit analysis approach for the external loads acting on the window unit. Several combinations of forces and moments are applied to the window unit to find the maximum loads, i.e. the limits loads, which generate stresses in the unit equal to the allowable ones, according to the selected design criteria.
The final design process of the ITER EC upper launcher (UL) was carried out between 2011 and 2018 under a Grant agreement between the European Domestic Agency F4E and a consortium of European associations, namely KIT (D), SPC (CH), DIFFER (NL), IPP (D), CNR (I), and IPF (D). The final design is scheduled for 2019. The final design review (FDR) will be split into several review processes for dedicated sub-components. One of these sub-components is the structural system of the EC launcher. This article presents a brief overview on the final design status of the ITER EC UL structure of spring 2018, including the history of development since 2004. It highlights the most challenging design issues and debates demanding project management steps. The lesson learned in the technical development of the design will be discussed, in view of the design work for future fusion devices.
The electron cyclotron resonance heating (ECRH) system of the ASDEX Upgrade tokomak has been upgraded over the last 15 years from a 2 MW, 2 s, 140 GHz system to an 8 MW, 10 s, dual frequency system (105/140 GHz). The power exceeds the L/H power threshold by at least a factor of two, even for high densities, and roughly equals the installed ion cyclotron range of frequencies power. The power of both wave heating systems together (>10 MW in the plasma) is about half of the available neutral beam injection (NBI) power, allowing significant variations of torque input, of the shape of the heating profile and of Qe/Qi, even at high heating power. For applications at a low magnetic field an X3-heating scheme is routinely in use. Such a scenario is now also forseen for ITER to study the first H-modes at one third of the full field. This versatile system allows one to address important issues fundamental to a fusion reactor: H-mode operation with dominant electron heating, accessing low collisionalities in full metal devices (also related to suppression of edge localized modes with resonant magnetic perturbations), influence of Te/Ti and rotational shear on transport, and dependence of impurity accumulation on heating profiles. Experiments on all these subjects have been carried out over the last few years and will be presented in this contribution. The adjustable localized current drive capability of ECRH allows dedicated variations of the shape of the q-profile and the study of their influence on non-inductive tokamak operation (so far at q95 > 5.3). The ultimate goal of these experiments is to use the experimental findings to refine theoretical models such that they allow a reliable design of operational schemes for reactor size devices. In this respect, recent studies comparing a quasi-linear approach (TGLF) with fully non-linear modeling (GENE) of non-inductive high-beta plasmas will be reported.
8 gyrotrons are in routine operation in the Electron Cyclotron Resonance Heating (ECRH) system at the ASDEX Upgrade tokamak. All gyrotrons are step-tunable operating at 105 and 140 GHz with a maximum output power of about 1 MW and 10 s pulse length. The system includes 8 transmission lines, mainly consisting of oversized corrugated waveguides (I.D. = 87 mm) with overall lengths between 50 and 70 meters including quasi-optical sections at both ends. The transmission lines are operating in air and transmission at maximum power levels was limited by arcing in the past. Several measures led to a significant improvement of the power handling capability of the transmission lines.
The torus window unit is a very particular component of the ITER EC H&CD upper launcher aiming to provide the primary vacuum and confinement boundary between the vacuum vessel and the transmission lines (TLs). The high power 170 GHz millimeter-wave beams generated by the gyrotrons travel along the TLs and pass through the window units, before being quasi-optically guided into the plasma via the upper launchers. The design of the window unit shall thus meet stringent requirements to guarantee the safety function, the millimeter-wave beam transmission and the structural integrity during normal operation and off-normal events. The unit consists of an ultra-low loss CVD diamond disk brazed to two copper cuffs; this structure is then integrated into a metallic housing by welding. The compliance with the requirements shall be assured by applying the ASME Section III Subsection NC code and a dedicated experimental qualification program. This paper reports the way in which the design of the unit, already optimized by FEM analyses against the ITER loading conditions, was further improved by the application of the ASME III-NC code, leading to a more feasible and simpler manufacturing and assembling sequence. In addition, the impact of the ITER project decision to change the inner diameter of the waveguide from 63.5 to 50 mm, to improve the beams' mode purity, was assessed and it is also discussed. Different materials for the metallic housing and in particular for the millimeter-wave inserts of the unit were compared using appropriate engineering criteria to mitigate the significant increase of the millimeter-wave thermal loads on the waveguides when the diameter is decreased.
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating power at 170 GHz, power supplies, control system, transmission lines, one Equatorial and the four Upper Launchers. With its high frequency and small beam focus the ECRH has the unique capability of driving locally current. While the Equatorial Launcher mainly acts for central heating and current profile shaping, the Upper Launchers aim on suppressing MHD instabilities, especially neoclassical tearing modes (NTM) triggering plasma disruptions. The Upper Launchers inject millimeter waves through a quasi-optical section consisting of three fixed and the front steering mirror set. The eight overlapping beams have focal points optimized for suppression of the q = 3/2 and q = 2/1 NTMs. Several project change requests required the redesign of the Upper Launchers and the connected ex-vessel system. This redesign includes a new boundary geometry of the launchers as well as a newly designed cooling system for the Blanket Shield Module (BSM), a modified flange of the BSM to the structural main frame and a refined optical design. Additionally shield blocks with integrated in-vessel waveguides were added and the closure plate with waveguide and supply line feedthroughs was adapted. Further changes, not all caused by PCRs, include newly designed ex-vessel waveguide components with a reduced aperture and redesigned ultra low-loss CVD diamond windows. Finally several components originally foreseen as off-the-shelf components have become part of the design scope. The new launcher design status is presented with selected results on numerical design validation.
The Electron Cyclotron diamond window which is located inside the port cell serves, together with an isolation valve, as primary vacuum boundary between the ITER vacuum vessel, the transmission lines and the port cell atmosphere and it functions as confinement barrier. The window consists of an ultra-low loss Chemical Vapor Deposition (CVD) diamond disk brazed into a metallic housing and it has to guarantee the compliance with very stringent nuclear safety requirements and an adequate transmission capability for high power mm-waves (1.31 MW at 170 GHz). The design of the window unit is approaching its final phase including design validation analyses, the development of a dedicated qualification program and prototyping activities. In preparation of the testing of complete window prototypes, pressure tests were performed on a mock-up formed by a diamond disk (D = 80 mm, d = 1.11 mm) brazed to two copper cuffs. The scope of the experiments was to show both the capability of the joining between the disk and the cuffs to keep the required vacuum tightness as well as the integrity of the disk when exposed to pressure loads. Based on the requirements defined for the pressure scenarios during normal operation and off-normal events, a test program was developed accounting for cyclic tests at low pressure differentials and overpressure tests up to 2 bar pressure difference over the disk to simulate severe accidental conditions. This paper gives an outline of the ongoing development of the overall qualification program of the ITER torus window and reports specifically on the experimental set-up and the successful outcome of the pressure tests of the brazed diamond disk mock-up. The test program for the complete window prototype needs discussion and approval by F4E and ITER and will directly determine the final qualification program for the series diamond windows.
Over the last 15 years, the Electron Cyclotron Resonance Heating (ECRH) system at the ASDEX Upgrade tokamak has been upgraded from a 2 MW, 2 s, 140 GHz system to an 8 MW, 10 s, dual frequency system (105/140 GHz). Eight gyrotrons were in routine operation during the current experimental campaign. All gyrotrons are step-tunable operating at 105 and 140 GHz with a maximum output power of about 1 MW and 10 s pulse length. The system includes 8 transmission lines, mainly consisting of oversized corrugated waveguides (I.D. = 87 mm) with overall lengths between 50 and 70 meters including quasi-optical sections at both ends. Further improvements of the transmission lines with respect to power handling and reliability are underway.
The optimized superconducting stellarator device Wendelstein 7-X (with major radius , minor radius , and plasma volume) restarted operation after the assembly of a graphite heat shield and 10 inertially cooled island divertor modules. This paper reports on the results from the first high-performance plasma operation. Glow discharge conditioning and ECRH conditioning discharges in helium turned out to be important for density and edge radiation control. Plasma densities of with central electron temperatures were routinely achieved with hydrogen gas fueling, frequently terminated by a radiative collapse. In a first stage, plasma densities up to were reached with hydrogen pellet injection and helium gas fueling. Here, the ions are indirectly heated, and at a central density of a temperature of with was transiently accomplished, which corresponds to with a peak diamagnetic energy of and volume-averaged normalized plasma pressure . The routine access to high plasma densities was opened with boronization of the first wall. After boronization, the oxygen impurity content was reduced by a factor of 10, the carbon impurity content by a factor of 5. The reduced (edge) plasma radiation level gives routinely access to higher densities without radiation collapse, e.g. well above line integrated density and central temperatures at moderate ECRH power. Both X2 and O2 mode ECRH schemes were successfully applied. Core turbulence was measured with a phase contrast imaging diagnostic and suppression of turbulence during pellet injection was observed.
Last year, two more two-frequency 1 MW gyrotrons have been installed and put into operation at ASDEX Upgrade. In total 6 gyrotrons were in operation in the last experimental campaign. This year, two more gyrotrons will be installed which will bring the upgraded ECRH system to its completion. The system upgrade also includes technological advances in subsystems and loads as well as new concepts for passive protection of in-vessel components against ECRH stray radiation.
ITER will be equipped with four EC (Electron Cyclotron) upper launchers of 8 MW microwave power each with the aim to counteract plasma instabilities during operation. The launcher antennas will be installed into four upper ports of the ITER vacuum vessel. All in-vessel microwave components of an EC antenna, comprising several sets of mirrors and waveguides are mounted into so-called upper port plugs. These are basically hollow casks which fit into the ports as cantilevered built-in components, forming thus integrated systems which guarantee optimum performance and simplify assembly and maintenance.
After completing the main construction phase of Wendelstein 7-X (W7-X) and successfully commissioning the device, first plasma operation started at the end of 2015. Integral commissioning of plasma start-up and operation using electron cyclotron resonance heating (ECRH) and an extensive set of plasma diagnostics have been completed, allowing initial physics studies during the first operational campaign. Both in helium and hydrogen, plasma breakdown was easily achieved. Gaining experience with plasma vessel conditioning, discharge lengths could be extended gradually. Eventually, discharges lasted up to 6 s, reaching an injected energy of 4 MJ, which is twice the limit originally agreed for the limiter configuration employed during the first operational campaign. At power levels of 4 MW central electron densities reached 3 x 10(19) m(-3), central electron temperatures reached values of 7 keV and ion temperatures reached just above 2 keV. Important physics studies during this first operational phase include a first assessment of power balance and energy confinement, ECRH power deposition experiments, 2nd harmonic O-mode ECRH using multi-pass absorption, and current drive experiments using electron cyclotron current drive. As in many plasma discharges the electron temperature exceeds the ion temperature significantly, these plasmas are governed by core electron root confinement showing a strong positive electric field in the plasma centre.
The future nuclear fusion power plants will require Electron Cyclotron Heating and Current Drive (ECH&CD) systems to heat up and stabilize the plasma inside the vacuum vessel. One of the key components of such systems is the Chemical Vapor Deposition (CVD) diamond window. The purpose of this device is to act as vacuum and tritium boundary while providing a high microwave transparency with minimal reflectivity. Although suited for high power microwave operation, the windows shall be internally monitored in order to properly ensure the ECH system efficiency and safety. In this paper, the latest assessment study on a set of diagnostics to be part of the window assembly is shown. The required diagnostics include arc and tritium detection, microwave stray radiation (perpendicular to the main beam and generated by cracks in the windows), pressure and disk temperature measurements. The devices must have a compact, simple and flexible layout, with a rugged design, to maximize serviceability and durability. When multiple options are possible for some of the diagnostic systems (e.g., scintillation devices vs solid state detectors for tritium detection), tradeoffs were assessed. To accommodate the diagnostics previously mentioned, a new design for the window housing was developed. As the design of the original diamond window assembly underwent further development since the beginning of this project, an update of the general layout was required. The new layout presented here integrates the updates of the windows assembly with those to the diagnostics. To validate the concepts, a test bench was developed to carry out measurements under conditions similar to the operative ones. (C) 2017 Elsevier B.V. All rights reserved.