Role of Best Estimate Plus Uncertainty Methods in Major Nuclear Power Plant Modifications

JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY(2010)

引用 7|浏览2
暂无评分
摘要
Current industrial trends to increase power production challenge the initial safety design limits of plants, which were evaluated generally using conservative tools and hypotheses. Advanced numerical tools and methods allow demonstrating that safety margins are still respected. These tools are modern fully validated thermal-hydraulic codes, coupled thermal-hydraulic/neutron-kinetic codes, and methodologies that use realistic hypotheses (rather than conservative ones) and estimate the uncertainty. The paper illustrates modern computational tools and approaches for improving plant operation and control and for supporting design modifications on existing nuclear power plants. A survey performed by Joint Research Centre's Institute for Energy is also presented and summarizes the feedback received by several countries of the European Union on the impact of modern Thermal-Hydraulics and Neutron-Kinetics tools on Operational Limits and Conditions and Operating Instructions and Procedures.
更多
查看译文
关键词
best estimate,uncertainty,system codes,plant modifications,operational limits and conditions,operating instructions and procedures
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要