FOR THE J-PARC PROJECT PROTORYPE CONTRO SYSTEM OF THE 60-ME VPROTORN LINAC

msra

引用 23|浏览3
暂无评分
摘要
J-PARC, a high-intensity proton accelerator facility, started construction in 2001, and expects an anticipated first beam in the summer of 2007. The initial 60-MeV of the proton linac has been under construction at KEK. Early studies with proton beams have already started. A proto- type control system based on the EPICS toolkit has been developed and evaluated in beam studies.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要