Scheduling of Parallel Jobs on Dynamic, Heterogenous Networks
msra(1995)
摘要
In using a shared network of workstations for parallel pr ocessing, it is not only impor- tant to consider heterogeneity and differences in processing power between the worksta- tions but also the dynamics of the system as a whole. In such a computing envir onment where the use of r esources vary as other applications consume and r elease resources, intelligent scheduling of the parallel jobs onto the available r esources is essential to max- imize resource utilization. Despite this realization, however, there are few systems avail- able that provide an infrastructure for the easy development and testing of these intelligent schedulers. In this paper, an infrastructure is presented together with a scheduler that is capable of both gang scheduling and dynamic task r eallocation of PVM applications.
更多查看译文
关键词
resource utilization,gang scheduling,heterogeneous network
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要