Plans for a new ECRH system at ASDEX upgrade

Fusion Engineering and Design(2003)

引用 27|浏览31
暂无评分
摘要
A new ECRH system is being constructed for ASDEX Upgrade with a total power of 4 MW, generated by four gyrotrons, and a pulse duration of 10 s. Particular features are the use of gyrotrons which can work at various frequencies in the range 104–140 GHz and correspondingly broad band transmission components. The transmission will be at normal air pressure, and at the torus we will have a tunable double disk vacuum window. A further aim is the installation of fast moveable mirrors for a feedback controlled localized power deposition.
更多
查看译文
关键词
ECRH system,ASDEX upgrade,Localized power deposition
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要