Evaluation of uncertainty in flood magnitude estimator on annual expected damage costs of hydraulic structures

WATER RESOURCES RESEARCH(1987)

引用 27|浏览7
暂无评分
摘要
In the risk-based design for hydraulic structures, the major task is the evaluation of the annual expected damage costs caused by floods. Due to the use of a limited amount of data in flood frequency analysis, the computed flood magnitude of a specified return period is subject to uncertainty. A methodology to integrate such uncertainty in the evaluation of annual expected flood damage is developed and illustrated through an example in culvert design. The effect of uncertainty in estimating flood magnitude using different hydrologic probability models with different sample sizes on the annual expected damage cost is examined. Results of the study show that the effect of the uncertainty in a flood magnitude estimate on annual expected damage is quite significant and is sensitive to the sample sizes and the probability distribution models used.
更多
查看译文
关键词
and stream stability is called the hydraulic design discharge. for a proposed highway bridge or culvert,the total cost to the public during its service life includes capital investment in the bridge or culvert,and various flood related,regular operation and maintenance costs,property,highway bridges or culverts are designed to safely pass floods under all but the most severe flooding conditions. the discharge associated with the critical flood magnitude which starts to cause hazard to life,sample size,service life,return period,probability distribution
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要