Progress towards top-up operation at SSRF
IPAC 2011 - 2nd International Particle Accelerator Conference(2011)
摘要
The Shanghai Synchrotron Radiation Facility (SSRF) has been in operation for user experiments in decay mode since May 2009. In the meantime various activities to prepare top-up operation at SSRF, including safety analysis and simulation, dedicated instrumentations and interlocks, control software, radiation measurements, injection optimization and top-up operation tests, have been carried out. In this paper, the progress towards top-up operation at SSRF is described together with its achieved performance. Copyright © 2011 by IPAC'11/EPS-AG.
更多查看译文
关键词
null
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要