Progress towards top-up operation at SSRF

IPAC 2011 - 2nd International Particle Accelerator Conference(2011)

引用 5|浏览1
暂无评分
摘要
The Shanghai Synchrotron Radiation Facility (SSRF) has been in operation for user experiments in decay mode since May 2009. In the meantime various activities to prepare top-up operation at SSRF, including safety analysis and simulation, dedicated instrumentations and interlocks, control software, radiation measurements, injection optimization and top-up operation tests, have been carried out. In this paper, the progress towards top-up operation at SSRF is described together with its achieved performance. Copyright © 2011 by IPAC'11/EPS-AG.
更多
查看译文
关键词
null
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要