Component based deployment of industrial control systems: a hybrid scheduling approach

Prague(2006)

引用 10|浏览3
暂无评分
摘要
This paper deals with the IEC 61499 standard. A func- tion block (FB) is an event triggered component and an application is a distributed FBs network on several de- vices. We consider these devices as multi-tasking PLCs. To validate the temporal behavior inside a device, we propose a hybrid scheduling approach combining off-line and on-line policies. This approach transforms applica- tion blocks into tasks thanks to the off-line policy. Then, it checks their required on-line feasibility. On the other hand, we propose also a temporal charcaterization of ex- changed messages between devices to check also their on- line feasibility.
更多
查看译文
关键词
IEC standards,industrial control,programmable controllers,scheduling,IEC 61499 standard,component based deployment,distributed function block network,event triggered component,hybrid scheduling,industrial control system,multitasking PLC,offline policy,online feasibility,online policy,programmable logic controller,Component,Function Blocks,PLCs,Real Time,Scheduling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要